Loading…
Loading…
83,473 results • Best match
Beautification of walls with painting slogans works etc under SBM MC Meham
Beautification of Walls with Painting/ Slogans works etc. under SMB MC Meham
Pcc RR works Block works Flooring Painting Steel works Electrification etc
13.52.2 Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On concrete work
Interior Painting, Exterior Water Proofing and Structural Steel Painting Works from Ernakulam South to Petta Metro Stations
PU Painting: Application of finishing coat of Polyurethane paint of minimum 40 micron thickness on surface which is not having any scaling. The work inclusive of cleaning the surface (roof truss at platform leveland station link bridges) with detergent/wire brush/emery paper/tools for inaccessible areaand making dust free. . the work shall be carried out as per the instruction of Engineer-in-charge and include all labour, materials, tools, plants, ladders, etc. all complete. The rate is inclusive of painting using rope hanging method or using ladder. Separate payment for scaffolding , working platforms, PP Spider net if used shall be paid under BOQ item no. 10
Work of Fabrication, Painting and Erection of Bottleneck Gate and Allied works to Gate No. 5 for use during Bakri Eid 2026 at Deonar Abattoir.
Work of Fabrication, Painting & Erection of Bottleneck Gate & Allied works to Gate No. 5 for use during Bakri Eid 2026 at Deonar Abattoir.
COMPREHENSIVE REPAIR/ MAINT OF DISTRIBUTION TRANSFARMER EARTHINGS, PAINTING WORK, GOD, LIGHTENIG ARRESTERS, DEHYDRATION OF TRANSFORMER OIL AND CONNECTED WORKS UNDER GE (N) AKHNOOR.
M&L for painting of transformer outer surface installed at various electric sub station/ pump housed, in situ/wksp with one coat of synthetic enamel paint using sprayer for transformer capacity 100KVA to 400 KVA after preparation of old painted surface including writing M/C No. (Note : (i) During process of painting, transformer will be under shut down for the period and the rate deemed to be included for running the sprayer machine with own arrangement by contractor. (ii) After completion of painting HT/LT outdoor bushing, cable termination joint, Oil inspection glass and name plates to be made clean using volatile cleanner)
This work is for the maintenance of PWD Roads Sub Division Muvattupuzha. It is for the maintenance of Tiled rooof, Floor and wall.The items included roofing, Plastering,painting ,False ceiling,GI steel work,Solid block work etc
13.98.1:Wall painting with plastic emulsion paint of approved brand and manufacture to give an even shade:One or more coats on old work