Loading…
Loading…
2,209 results • Best match
S&T work i.c.w Provision of RUB in lieu of trespass location at Km 1075.391 (closed LC no 182/C) between SFH-ML stations on Lucknow-Ayodhya Cantt Section & Provision of RUB at KM.1071.404 near ROB no.789A (Sadar ROB) between LBH & LKO stations on ... Northern Railways .
as per drawing and as directed by Engineer Incharge by trenchless technology for laying of signalling /telecom/power cable under track /culvert etc. cable laying covered separately. Inspection-Consignee for Supply of DWC/HDPE pipe. The following required coupling arrangement shouldalso be supplied: 1. Suitable snap fit couplers withrubber O ring, 2. Spacers, 3. Tees. 4. Bend. 5. End Cap(1 no. =6mtr ,Straightpipe). (A) The cost shall include horizontal boring through any intermediate obstruction, either natural or man made or any boundary etc. (B) The rate is inclusive of all the materials equipment and labour required for during trenchless horizontal boring under the railway track. Nothing extra shall be admissible on any account than the rate quoted above. (C) The Pipeis to be laid underrailway track/road /culvert. All necessary arrangement are to be provideand all precautions are to be end is not deviated from the horizontal level line by more than 250mm in horizontal and vertical direction. (D) The rate shall be inclusive of direction and protection of underground utilities encountered during boring. (E) The payment for boring shall be made only when DWC/HDPE pipe are laid in the bore.
Package no12-1)Construction of Ashphalt Road from Old Bazar Road to Edge of River at ward no.09,10. 2) Development of Road From Railway Paralal road at ward no.11. 3) Construction road from Infront of Urban Development Office at ward no.12. 4) Construction Drain & Deck slab From infront of Library beside of Road at ward no.12
Package no 12-1)Construction of Ashphalt Road from Old Bazar Road to Edge of River at ward no.09,10. 2) Development of Road From Railway Paralal road at ward no.11. 3) Construction road from Infront of Urban Development Office at ward no.12. 4) Construction Drain & Deck slab From infront of Library beside of Road at ward no.12
Refurbishment of 614 nos. CTRB SKF TBU 1639433 BB/1639433 BC LHB Coach Axle Box Bearing of SKF make fitted in LHB Coaches of Carriage Workshop, Eastern Railway, Kanchrapara for 02 (two years) through OEM, M/s SKF India Limited, 611-617,6th floor, Bestech Chambers, B-Block, Sushant Lok, Phase-1, Gurgaon-122002 on Single Tender basis on Single packet system
33 KV Stenthring Line at following Places at Mirzapur- 1.Sikhar to Mediya feeder 2. 33 KV JANGAL MOHAL Line 3. 33 KV PADARI Line
Supply of following materials:- Laying 33 KV XLPE cable through Railway Crossing Near Vishwnathpuri railway crossing for 33 KV JANGAL MOHAL Line Enamated From 132/33 Kv Pirallipur,Mirzapur works site as per RESSPO norms. (Provided by Contractor)
Improvements to road from (i)Venugopalapura to Chalaganahalli via Mavahalli, Kamandahalli (Road ID-120), (ii)Arimanahalli to AP Border via Thalampalli, Bisanatham Railway Station (Road ID-960), (iii)Dinnur- Budikote Road (MDR) to Budikote via Bommaganahalli, Bueldaynahalli, Marandahalli (Road ID-2211), (iv)Harati Road to Kenchapura via Harati Mallandahalli (Road ID-2485), (v)Yalaburgi to Ithandahalli via Nernahalli (Road ID-2789) in Kolara PIU - ADB FINANCED
Improvements to road from (i)Venugopalapura to Chalaganahalli via Mavahalli, Kamandahalli (Road ID-120), (ii)Arimanahalli to AP Border via Thalampalli, Bisanatham Railway Station (Road ID-960), (iii)Dinnur- Budikote Road (MDR) to Budikote via Bommaganahalli, Bueldaynahalli, Marandahalli (Road ID-2211), (iv)Harati Road to Kenchapura via Harati Mallandahalli (Road ID-2485), (v)Yalaburgi to Ithandahalli via Nernahalli (Road ID-2789) in Kolara PIU - ADB FINANCED
1)SBC-TK-SPGR Section- Proposed construction of ROB at LC.No50 @KM:85/700- 800 42m composite Girder 2)Proposed construction of RUB at LC gate No.48 @kM 81/500-600 between Mallasandra and Gubbi stations in ADEN/YPR sub division 3)SBC-TK-SPGR ... GBD Railway station ... Kengeri railway station ... of railway alignment ... of railway alignment ...
1 01 Design, supply, installation , testing and Numbers 167.00 11865.00 1981455.00