Loading…
Loading…
2,468 results • Best match
Augmentation of sub-station of Dholpur station of Agra Division.
Supply, Erection, Testing & Commissioning of 04 pole structure with clamp, nut, bolt, busbar etc 'C' channel length 60M (04 Nos. Rail pole supplied by railway to contractor)
Provision of track machine siding of length of 300m at DNR, ARA, BXR, DLN & SLD under Sr.DEN/3/DNR section.
When distance of nearest quarry is more cum than 200 km and up to 250 km DANAPUR DIVISION-ENGINEERING/EAST CENTRAL RLY 25mm gap 'in-situ' welding during traffic block using Railway's welding portion and finishing of weld to meet the prescribed tolerances and pass all stipulated tests with all required labour, materials, consumables, tools, equipments etc. to complete the work in all respect as per IR's "Manual for Fusion Welding of Rails by Alumino - Thermic Process" with latest correction slips, including marking of welded joint, painting weld collar with anticorrosive paint, restoration of track near weld joint to original position and fixing of joggled fish plate at new weld, to be removed after passing of weld in USFD test as directed by Engineer in charge. Note: 1. Welding portion and related accessories as per Annexure - I shall be supplied by Railways. All other items required shall be supplied by the Contractor. 2. Welding shall be carried out only by trained welder having valid competency certificate. 3. Hydraulic Weld trimmer shall be used for chipping and profile Grinder for finishing. 4. Required nos. of Joggled fish plates shall be supplied by Railway at nearest P. Way Stores and the same shall be returned at nearest P. Way Store or at other location as per direction of Engineer-in-Charge after release from track.
FENTANYL CITRATE,INJECTION ETOMIDATE 0.2% & ISOFLURANE ANESTHETIC LIQUID
Description :FENTANYL CITRATE 50 MCG PER ML 2 ML INJECTION. Product should be in Railway Board approved product list. ] Consignee CMS/RNC, SER Jharkhand 120.00 Numbers
CYCLOSPORINE 100MG CAP/TAB
Description :CYCLOSPORINE 100MG CAP/TAB ] RAILWAY HOSPITAL 360.00 Numbers BENGALURU, SWR Consignee RAILWAY HOSPITAL MYSURU, 100.00 Numbers SWR
Ukai Songadh - Jalgaon Section:- Rag picking and removal of debris, grass, etc. for Two Years in the jurisdiction of DEN/East/MMCT.
Cleaning of tracks by collecting waste plastic TRM bottles, plastic bags, papers textra packs and others waste materials etc. on the all lines and disposal of collected materials beyond Railway's limit complete with including all costs with contractors' own labours, crossing of tracks, lead lift, loading and unloading taxes etc as per direction of Engineer in charge of work ( Nothing shall be supplied by Railway). (UP/DN line) MUMBAI CENTRAL DIVISION-ENGINEERING/WESTERN RLY
Secunderabad Division -SW-I SC-WD section (DN line): CTR (P) of Exg. 52kg / 60kg / 72uts/90uts rails on PSC6 sleepers 1660Nos/km density with new 60kg/90uts rails on PSC6 wide sleepers 1660 Nos./KM including recoupment and increasing of ballast ... sleeper track for ...
2115.00 block using Railway's welding portion & Welder and finishing of weld to meet the prescribed tolerances and pass all stipulated tests with all required labour, materials, consumables, tools, equipments etc. to complete the work in all respect as per IR's "Manual for Fusion Welding of Rails by Alumino - Thermic Process" with latest correction slips, including marking of welded joint, painting weld collar with anticorrosive paint, restoration of track near weld joint to original position and fixing of joggled fish plate at new weld, to be removed after passing of weld in USFD test as directed by Engineer in charge. Note: 1. Only welding portion and related accessories as per Annexure - I and Welder shall be supplied by Railways. 2. Hydraulic Weld trimmer shall be used for chipping and profile Grinder for finishing. 3. Required nos. of Joggled fish plates shall be supplied by Railway at nearest P. Way Stores and the same shall be returned at nearest P. Way Store or at other location as per direction of Engineer-in- Charge after release from track. Providing Centre Line / Rail Level, reference Pegs on formation at an interval of 30 metres on one side or at centre of proposed / existing track, as directed by engineer in- charge for linking of new track / CTR / Deep Screening / Lifting / Lowering works, duly embedding in formation including marking with contractor's paint. Note: (1) Rails/tie bar of suitable size bar shall be supplied by the Railways from nearest Stores Depot. In case of hard wood peg, the hard wood will be supplied by the contractor. (2) Excavation and concrete work, if required, will be paid separately.