Loading…
Loading…
2,342 results • Best match
Tender for the work of Deviation of Existing 200 mm dia DI pipeline at service road due to BMRCL project, at opposite to Kalamandira complex,1st block HRBR Layout Kalyan Nagar coming under HRBR Service Station of AEE N-2-2 sub division.
3/9 Hennur road chandrika soap factory junction to railway gate via vinayaka temple road (AEE E21 sub dvn) 200 mm dia DI-2005 150 mm dia DI-2005 100 mm dia DI-2005 225 mm dia SW PL 1.50 Km 4.10 200 mm dia DI 150 mm dia DI 100 mm dia DI 1.20 Km 1.00 Km 1.00 Km 200 mm dia DI 150 mm dia DI 100 mm dia DI 1.20 Km 1.00 Km 1.00 Km 2005 3.16 300mm dia RCC Np3 3.0 Km (Both Side) CSF to end (RT)= 1.30 Km Amms to RT = 700 Rmt
3 LPE COATED CARBON STEEL PIPELINE LAYING AND ASSOCIATED WORKS IN Salem GA (GROUP B)
"PIPELINE LAYING LIAISONING AND GETTING PERMISSIONS FROM THE STATUTORY AUTHORITIES Applying permission, follow up and getting permis sion from the statutory authorities, obtaining work permits/ NOC from various statutory authorities having jurisdiction before execu tion of the works and complying with all stipulations / conditions / recommendations of the said authorities. Only R.R charges shall be paid by Owner. The work also includes submitting request for (after obtaining the letter from client) permission , follow up , a ssisting in site inspections / route suevey / site report making/making site inspection drawings , submitting at designated offices , resubmission after correction , modification if required , soft and hard copy in nos. as required /if required in sizes , and coll ecting permission from the statuatory authorities including NHAI , PWD , Railways , Irrigation , Forest , Municipal Corporation etc. Obtaining work permits / NOC from various statutory authorities having jurisdiction before execution of the work and complying with all stipulations /conditions/recommendations of the said authorities. Only statutory fees shall be paid by the owner. Note: 1. Payment shall be based on the actual length of pipeline laid. This rate shall be paid seperately & not inclusive in above specifi ed SOR item of INSTALLATION OF CARRIER PIPE BY OPEN TRENCH METHOD (ALL KINDS OF SOIL)."
HYB Division: Annual repairs/maintenance of quarters and service buildings of SSE/W/MLY under the jurisdiction of ADEN/Estates-II/HYB for a period of one year (2026-2027)
10000.00 pressed moulded thermosetting glass Fibre reinforced polyester resin (GRP) sectional water storage tanks confirming to IS 14399 (Part - I & II) on Railways existing staging/roof top including all accessories like external bracing, L brackets, manhole & drain panel assembly etc., including providing and fixing required fittings for inlet, outlet/delivery, drain and outflow pipes with all contractors labour, tools and plants, material, all lead & lift taxes complete for tanks of height 1M- For a capacity Upto 10,000 Litres
HYB Division: Annual repairs/maintenance of quarters and service buildings under the Jurisdiction of SSE/W/IRISET & SSE/W/SO-I OF ADEN/Estates-I/HYB for a period of one year (2026-2027)
20000.00 pressed moulded thermosetting glass Fibre reinforced polyester resin (GRP) sectional water storage tanks confirming to IS 14399 (Part - I & II) on Railways existing staging/roof top including all accessories like external bracing, L brackets, manhole & drain panel assembly etc., including providing and fixing required fittings for inlet, outlet/delivery, drain and outflow pipes with all contractors labour, tools and plants, material, all lead & lift taxes complete for tanks of height 1M- For a capacity Upto 10,000 Litres
Bi- Annual Rate Contract for Emergency Power Restoration Work of 400/220/132/66kV lines under Bharuch Transmission Circle.
claimed by the transporters, railways etc, shall be to the account of the Contractor. For shortages of
Tender for Bi- Annual Rate Contract for restoration of various 66kV Class Transmission lines, damaged due to natural calamity / any other abnormality under various transmission divisions of Bharuch Circle
claimed by the transporters, railways etc, shall be to the account of the Contractor. For shortages of