Loading…
Loading…
414 results • Best match
DESIGN, ENGINERING, SUPPLY, CONSTRUCTION OF ALL CIVIL AND MISCELLANEOUS WORKS FOR INFRASTRUCTURE DEVELOPMENT OF 2000 MW RVUN SOLAR PARK INCLUDING WORKS MENTIONED IN TNC-05/2026-27 AT VILLAGE BODANA, TEHSIL- BAP, DIST. - PHALODI (RAJASTHAN)
Development of water distribution network of required diameter of HDPE PIPE (90/110 mm) including all civil work, chamber for valves from overhead tanks to the park area which includes solar plots, PPSs, solar park office, guest house, main gates of park etc as per approved design and drawing.
Shifting obstructing electrical infrastructure for Pilkhuwa Dhaulana road widening under Deposit Scheme 2026 27 includes LT line 11 KV feeders from Partapur Dhaulana Khera I substations and 33 KV feeders under EDC Hapur
Carrying out pre-commissioning checks, jumpering, and complete line energization of the newly erected 33 kV overhead line and underground cable system, complete in all respects. The scope of work includes executing heavy-duty jumper connections at terminal poles, double-pole (DP) structures, cut-points, and isolation switches using proper PG clamps, bimetallic connectors, or crimped aluminum lugs as per layout requirements. It includes conducting mandatory pre-energization safety and technical tests—including insulation resistance (Megger) profiling, phase-sequence verification, continuity mapping, and high-voltage (Hipot) testing where applicable. The contractor shall coordinate with the grid substation staff, manage formal permit-to-work (PTW) closures, safely remove temporary lines/earthing sets, and sequentially energize the system under live conditions. The rate is inclusive of specialized testing instruments, safety gear, line-clearance tools, liaison assistance, and highly skilled electrical labor deployed strictly as per standard RESPO/CEA norms, distribution engineering safety manuals, and directions of the Site In-charge.
Shifting obstructing electrical infrastrusture for pilkhuwa dhaulana road widening under deposit scheme 2026 27 includes LT line 11 KV feeders from partapur Dahulana Khera 1 substation and 33 KV feeders under EDC Hapur
Carrying out pre-commissioning checks, jumpering, and complete line energization of the newly erected 33 kV overhead line and underground cable system, complete in all respects. The scope of work includes executing heavy-duty jumper connections at terminal poles, double-pole (DP) structures, cut-points, and isolation switches using proper PG clamps, bimetallic connectors, or crimped aluminum lugs as per layout requirements. It includes conducting mandatory pre-energization safety and technical tests—including insulation resistance (Megger) profiling, phase-sequence verification, continuity mapping, and high-voltage (Hipot) testing where applicable. The contractor shall coordinate with the grid substation staff, manage formal permit-to-work (PTW) closures, safely remove temporary lines/earthing sets, and sequentially energize the system under live conditions. The rate is inclusive of specialized testing instruments, safety gear, line-clearance tools, liaison assistance, and highly skilled electrical labor deployed strictly as per standard RESPO/CEA norms, distribution engineering safety manuals, and directions of the Site In-charge.
Augmentation of Water Supply Scheme Village Nanak Nagri in Block Phagwara, District Kapurthala (Under head NABARD XXXI/State Share/4215)
Distribution network
Miscellaneous Maintenance Contract for all types of Electrical General Works such as Sub-stations, Cabling installations, Feder boxes, Junction Boxes,Pumping installations,CLS panels at Stations, LC Gates, IBs, High Masts, Lifts , Escalators,Various types of Lights , fans, Earthing installations, HT & LT feeder Panels with associated installations under Juridiction of SSEE(P)BBS & SSEE(P)PUI in Khurda Road Division for three years
Supply & erection of G.I. 50X6/25x6 Metre flat/Strip for Substation (Grid) earthing on surface or in recessed for connection etc. as required. (including connection/terminating with G.I nut, bolt, spring, washer etc. as required.(Jointing shallbe done by overlapping and with 2 sets of G.I nut bolt& spring washer spaced at 50mm)
Miscellaneous Maintenance Contract for all types of Electrical General Works such as Sub-stations, Cabling installations, Feder boxes, Junction Boxes,Pumping installations,CLS panels at Stations, LC Gates, IBs, High Masts, Lifts , Escalators,Various types of Lights , fans, Earthing installations, HT & LT feeder Panels with associated installations under Juridiction of SSEE(P)Railkunj, SSEE(M)/Railsadan and SSEE(P)/Railvihar in Khurda Road Division for three years.
Supply & erection of G.I. 50X6/25x6 Metre flat/Strip for Substation (Grid) earthing on surface or in recessed for connection etc. as required. (including connection/terminating with G.I nut, bolt, spring, washer etc. as required.(Jointing shallbe done by overlapping and with 2 sets of G.I nut bolt& spring washer spaced at 50mm)