Loading…
Loading…
414 results • Best match
REPAIR/MAINT OF EXTERNAL WATER SUPPLY NETWORK AT AKHNOOR MIL STN UNDER GE (N) AKHNOOR
Supply and fixing vinyl display board frame size 6'x4' showing schematic diagram of electric/water supply distribution network as sketch provided to be fixed on walls in installation all as specified and directed by Engr-in-charge.
LEAKGE REPAIRING OF RISING MAIN AND DISTRIBUTION SYSTEM AT VARIOUS JJY SCHEME UNDER SUB DIV. BASSI
Maintenance of pipe lines which includes repairing of bursts & leakages pollution control, survey & removal of choking, disconnection of illegal connections,collection & recording minimum 10 Nos. residual chlorine samples during supply timings, interconnections and all works related to pipe line network in existing distribution / rising main pipe lines of all sizes by digging out suitable size of pit in soft and lose soil / hard soil including cutting of black top, WBM & CC top of road of any size at work site. this will also includecutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and refilling of pit by excavated sand by ramming it at sides of pipes and upto ground level. For entire job contractor will be use their own T&P. Contractor with his own resources shall arrange de-watering if any and restore any aenity at his cost demaged while performing the work in this item. The work includes daily patrolling and repair the leakages within stipulated time and complete maintenance of pipe line network within scope of work for per km pipe line per month. Jionting material shall be provided by the department.
Construction of 01 no of 11kV link line from 110/11 KV Yaragatti sub station for a distance of 6.77 Rkm in Jamkhandi division on total turn key basis.
A= Maximum value of Distribution network work executed in any one year during the last 5 years i.e 2020-21,2021-22,2022-23, 2023-24 & 2024-25 ( UP dated to __________________ price level) taking into account the completed as well as works in progress
COMPREHENSIVE REPAIR AND DAY TO DAY MAINTENANCE OF EXTERNAL ELECTRIFICATION SYSTEM ALLIED WORKS AND CONNECTED EM INSTALLATIONS WK IN EAST OF MALL ROAD UNDER GE (EAST) JRC
Attending day to day complain for attending complaint for AOR of west of mall road of LT electric distribution network UG /OH of all nature like No light, faulty insulator, broken conductor& cable fault , burnt out MCCB`s, MCBs, isolators, switch fuses, service cables etc upto DB in buildings/OTM in east of mall of road area complete all as specified and as directed by Engineer-in-Charge. Cost of aluminium lugs saddle of any size for fixing of cables on walls, for finishing work and all fixing accessories required for rectifying the complaints items are included in the rate quoted by contractor. Note ‘A’:- (i) Cost of materials for laying of cables strecthing of OH conductor, burnt out MCBs, MCCB`s will be measured and paid separately under relevant items as supply only being labour element is deemed to be included in the cost for said item. (ii) All T&P required for electrification work shall be provided by contractor at own arrangements to the trades supply only. (iii) Contractor will deploy following well experienced and well conversant manpower against this item during round the clock (03 shifts) Electrician -01 No & Helper -02 Nos at a time for attending LT distribution complaint all working days including Sunday & all Holidays. Note for items No 05
WORK OF REPAIR AND MAINTENANCE OF PIPE LINE ALONG WITH ROAD RESTORATION WORK UNDER RnD SUB. DIVISION BEAWAR IN THE JURISDICTION OF DIVISION BEAWAR
Maintenance of pipeline irrespective of size & material which includes repairing of Bursts & Leakage pollution Control survey & removal of choking disconnection of illegal connections collection & recording minimum 10 Nos. residual chlorine samples during daily supply timings interconnections and all works related to pipe line of all sizes by digging oit suitable size of pit in soft and loose soil/hard soil including cutting of black top WBM & CC top of road of any sizr at work site. this will also include cutting of pipe ends fixing of pipe piece with jointing material to make repair leak proof and refilling of pit by excavated sand by ramming it at sides of pipes and upto ground level. for entire job contractor will use their own T&P contractor with his own resources shall arrange dewatering JCB & Tractor compressor if any and restore any amenity at his own cost damaged while performing and repair the leakage within stipulated time and complete maintenance of pipe line network of rising and distribution pipe line network within the scope of work for per KM pipe line per month. jointing material shall be provided by the department.
Water Supply Scheme Of PM Awas Yojana At Nagar Palika Parishad Unnao District Unnao under Pradhan Mantri Awas Yojna Urban
Supply, Installation, Commissioning and 2 Yrs O&M of Fluoride removal plant (Vendor have to select Technology based on capacity Electrolytic de-fluoridation plant or Media based system or nano technology) of desired capacity for treatment of TubeWell water to desirable quality as per BIS: 10500, as per satisfaction of engineer-in-charge and carrying the treated water to OHT for distribution of potable water to households through the distribution network water supply schemes. During O&M all consumables for continous effective running of plant to be provided by contractor for which no claim in this regard will be admissible