Loading…
Loading…
414 results • Best match
Implementation of Remaining work for Cluster wise Single Village Water Supply Schemes under Jal Jeevan Mission Cluster 30 Cluster No 30 Population 10470 FHTC 2112 Habitations 54 Villages 35 Blocks BENGABAD District GIRIDIH
Rising and Distribution Network with House Connection up to 10 Nos. including Platform & Stand post
CLEANING OF OH AND UG WATER SUMPS, SEWAGE SUMPS, EXTERNAL PAINTING OF RCC AND IRON STRUCTURES, PAINTING OF PLANTS AND EQPTS IN E/M INSTALLATIONS AS PER COLOUR CODE INCLUDING SOME ALLIED WORKS AT MIL STN KANCHRAPARA UNDER GE BARRACKPORE
M&L for removal of sewage and garbage from Filter feed Tank equalization/collection tank with the help of sewage pump (capacity of sewage sumps is 15000 Gallons) mounted on portable bowser and replacement of air diffusers with unserviceable distribution pipe network of STP 300/350 Cum/Day including washing of old surface with brooming down or steel wire brushing and applying two coats of colour wash over a coat of white wash complete all as specified and directed.
P,L,J and T of 250 mm DI K-7 RM pipeline 2300M, 150mm DI K-7 pipeline 430M and 100mm DI K-7 Distribution pipeline 1850M with construction of OHSR 200KL, CWR_ 400KL, Pump house Type I with pumping machinery and other associated works for New Medical
Maintenance of pipelines irrespective of size & material which includes Repairing of Bursts & leakages pollution control, survey & removal of choking, disconnection of illegal connections, Collection & recording minimum 10 nos. residual chlorine samples during daily supply timings, interconnections and all works related to pipeline network in existing distribution /rising main pipe lines of all sizes by digging out suitable size of pit in soft and loose soil/ hard soil including cutting of Black top, WBM & CC top of road of any size at work site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and refilling of pit by excavated sand by ramming it at sides of pipes and upto ground level. For entire job contractor will use their own T & P. Contractor with his own resources shall arrange de-watering,JCB & Tractor compressor if any and restore any amenity at his own cost damaged while performing the work in this item. The work includes daily patrolling and repair the leakages within stipulated time and complete maintenance of pipe line network of rising and distribution pipeline network within the scope of work for per km pipe line per month. Jointing material shall be provided by the department.
Annual maintenance Contract of the Electrical Installation Work at CMOH Office Building and DRS Building under Nandigram HD. Nandigram-I --- Deployment of manpower (For 3 years).
A. Scope of Work The scope includes routine, preventive, corrective and Breakdown maintenance of the entire electrical installation within the premises, including but not limited to: i. Distribution Substations including HT gear, Transformers (performing different safety and performance tests and overhauling of substation equipments as detailed under A.2. ii. LT distribution networks and panels including Power and control cables iii. Electrical wiring for all buildings (residential and non-residential) iv. Distribution Boards (DBs), LT panels, feeder pillars, AMF panels v. Switchboards, sockets, Computer Points, Fittings & Fixtures vi. Electrical Power outlets for air-conditioning systems, sound systems, PA systems, etc. vii. Compound lighting including high mast viii. All type of signboards e.g. Glow-sign, Metal Signage, LED signage ix. Electrical installations up to switchboards/panels for lift machine rooms & pump rooms x. Timers for AC, Air-Curtain & compound lighting (operation, configuration, repair/replacement where supplied departmentally) xi. Fire detection system resetting/switching off as and when directed by EIC / AE / JE xii. Lightning Conductor Installations including it’s Earthings xiii. Operation of DG sets
Annual routine and preventive maintenance of the Electrical installation at Sub Divisional Court, Correctional Home , SDO Office Campus and other Govt. buildings, Contai, Purba Medinipur.
A. Scope of Work The scope includes routine, preventive, corrective and Breakdown maintenance of the entire electrical installation within the premises, including but not limited to: i. Distribution Substations including HT gear, Transformers (performing different safety and performance tests and overhauling of substation equipments as detailed under A.2. ii. LT distribution networks and panels including Power and control cables iii. Electrical wiring for all buildings (residential and non-residential) iv. Distribution Boards (DBs), LT panels, feeder pillars, AMF panels v. Switchboards, sockets, Computer Points, Fittings & Fixtures vi. Electrical Power outlets for air-conditioning systems, sound systems, PA systems, etc. vii. Compound lighting including high mast viii. All type of signboards e.g. Glow-sign, Metal Signage, LED signage ix. Electrical installations up to switchboards/panels for lift machine rooms & pump rooms x. Timers for AC, Air-Curtain & compound lighting (operation, configuration, repair/replacement where supplied departmentally) xi. Fire detection system resetting/switching off as and when directed by EIC / AE / JE xii. Lightning Conductor Installations including it’s Earthings xiii. Operation of DG sets
Implementation of Remaining work for Cluster wise Single Village Water Supply Schemes under Jal Jeevan Mission Cluster 25 Cluster No 25 Population 10470 FHTC 2278 Habitations 21 Villages 15 Blocks JAMUA District GIRIDIH
Rising and Distribution Network with House Connection up to 10 Nos. including Platform & Stand post