Loading…
Loading…
1,540 results • Best match
Annual Rate Contract for Running maintenance work of pump house at RWSS Swai Badi under O M sub division Sardarshahar District Churu
Maintenance of pipe line irrespective of size & material, which includes repairing of bursts and leakages, pollution control, survey and removal of chocking, disconnection of illegal connections, collection and recording minimum 10 nos. of residual chlorine samples during daily supply timings, inteconnection and all works related to pipe line networks in existing distribution/rising main pipe lines of all sizes by digging out suitable size of pit in loose soil/hard soil, including cutting of black top, WBM and CC top of road of any size at work site. This will also includes cutting of pipe ends, fixing of pipe piece with jointing material to make repait leak proof and refilling of pit by excavated sand by ramming it at sides of pipe and upto ground level. For entire job, contractor will use their own T&P. Contractor with his own resources shall arrange dewatering, JCB (excavator) and tractor compressor, if required any, and restore any amenety at his own cost, damaged, while performing the work in this item. This works includes daily pattrolling and repair of leakages within stipulated time and complete maintenance of pipe line network of distribution and rising main pipe line network within the scope of work for per KM pipe line per month. Jointing material shall be provided by the department
Carrying out preventive/ Schedule and breakdown maintenance work of 220/132/33 kV, Grid Sub-Station, Jainamore, Bokaro for the period from 01.06.2026 to 31.03.2027 (i.e., 10 Months)
Maintenance / Emergency Maintenance of Grid Substation as per schedule and JOB provided by Engineer In-charge.
Selection of ISP for the dev of PPIN and prvn of irrgn services to 835 Ha in Dist SBS Nagar of KCS 2 under MCAD scheme
Supply, Installation, Testing and Commissioning of Micro Irrigation System comprising Gravity Bulk Feeders, Construction of Sump cum Pump house, Supplying and installation of Pumping machineries, Terminal Bay, Electrical substation, Electrical power line and other appurtenant works including construction of Pipe Distribution Network including SCADA and Automation for providing irrigation facility to 835.00 Ha under Modernization of Command area development works (MCAD) Scheme in Block Saroya Tehsil, Balachaur District, SBS Nagar in Kandi area from Outlet 119.200 KM of Kandi Canal Stage-2 with all accessories, Operation and Maintenance for 5 years after successful commissioning and transfer (BOMT) on Lump sum basis.
Replacement of plastic body and plastic blade wall bracket fan by metal body and metal blade wall bracket fan at Gandhi Memorial Hospital.
Supply & fixing of 230 V, 18-inch (450 mm), metal-body, wall-mounted fan (Make EPC Electrical Pvt. Limited / Crompton-450 mm WM SSTORM 2 / Usha, 450 MM TURBO 180) on wall by S&F rag bolts, nuts & washers (8 mm dia x 62 mm long or as reqd.) including connection by S&F 1.1 KV Gr. 3 core 1.5 sq. mm PVC insulated copper cable (Make RR Kabel / Havells /Finolex),
Consultancy service for Preparation of revised detailed project report
Preparation of Revised Detailed Project Report (DPR) and TAC notes/presentations at CWC New Delhi for C/O Medium Irrigation Project to Various Panchayats of Jawalamukhi Area in Distt. Kangra (Himachal Pradesh) the DPR should be framed as per detailed guidlines of CWC which should include detailed Design of Rising mains, Pumping machinery, Gravity mains, Tanks, Distribution network and micro irrigation, Detail of village wise names of farmers of each khasra number of CCA and cost estimation complete based on the Analysis of rates as per cost price level 2024 complete in all respect and to get approval from the competent authority/CWC New Delhi and to the satisfaction of Engineer in Charge.
APPOINTMENT OF PROOF ENGINEERING CONSULTANT (PEC) FOR Construction of Distribution system for 5765.34 Ha. of CCA including Command Area Development (CAD) of Salandi Left Main Canal from RD 71.505 km to 73.003 km through UGPL
Follow-up and vetting of Re-engineering works required to be done by EPC contractor for actual site condition for distribution network and CAD & WM works for 5765.34 Ha. and micro irrigation for 576. 534 Ha of Salandi Left Main Canal from RD 71.505 km to 73.003 km.