Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.5 LAdmitted-Finance | ₹39.5 L | L1 | Admitted-Finance |
| 2 | L2₹42.9 LAdmitted-Finance | ₹42.9 L | L2 | Admitted-Finance |
| 3 | L3₹43 LAdmitted-Finance MARS HOUSE SURVEY NO 281 FP NO 96 TP NO 215 NR SERENE ELEGANCY B H RAJTHAL RESTAURANT S P RING ROAD BOPAL AHMEDABAD 380058 | AHMEDABAD | AHMADABAD | GUJARAT | 380058 | ₹43 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Samarth Engineers L2 | Multi Mantech International Pvt. Ltd. L1 | mars planning & engineering services pvt ltd L3 |
|---|---|---|---|---|---|---|
| 1.00 | Providing Proof Engineering Consultancy Services for vetting the planning & design, report & drawing etc. as per the agreed plan
based on the submission of plan of the EPC contractor. The services shall be provided complete in all respect required for
procurement & construction of UGPL network for achieving the desire command area successfully for 5765.34 Ha. of Salandi
Left Main Canal from RD 71.505 km to 73.003 km including submission of Report. | 1 | Nos | 27,88,000 ₹27.9 L | 20,48,000 ₹20.5 L | 36,00,000 ₹36 L |
| 2.00 | Follow-up and vetting of Re-engineering works required to be done by EPC contractor for actual site condition for distribution network and CAD & WM works for 5765.34 Ha. and micro irrigation for 576. 534 Ha of Salandi Left Main Canal from RD 71.505 km to 73.003 km. | 1 | Nos | 15,01,000 ₹15.0 L | 19,00,000 ₹19 L | 7,00,000 ₹7 L |
Tender Value
Refer Docs
EMD Value
₹1 L
Closing Date
6 Jan 2026, 5:00 pmClosed
CCE, ABP, SALAPADA
CCE, ABP, SALAPADA
APPOINTMENT OF PROOF ENGINEERING CONSULTANT (PEC) FOR Construction of Distribution system for 5765.34 Ha. of CCA including Command Area Development (CAD) of Salandi Left Main Canal from RD 71.505 km to 73.003 km through UGPL
2025_CCEAB_123654_1
CCEABP- 19 of 2025-26
National Competitive Bid
Consultancy Services
720 days
CCE, ABP, SALAPADA
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹1 L
Yes
2 Feb 2026
23 Dec 2025
7 Jan 2026
23 Dec 2025
6 Jan 2026
23 Dec 2025
23 Dec 2025 - 27 Dec 2025
Providing Proof Engineering Consultancy Services for vetting the planning & design, report & drawing etc. as per the agreed plan based on the submission of plan of the EPC contractor. The services shall be provided complete in all respect required for procurement & construction of UGPL network for achieving the desire command area successfully for 5765.34 Ha. of Salandi Left Main Canal from RD 71.505 km to 73.003 km including submission of Report.
Follow-up and vetting of Re-engineering works required to be done by EPC contractor for actual site condition for distribution network and CAD & WM works for 5765.34 Ha. and micro irrigation for 576. 534 Ha of Salandi Left Main Canal from RD 71.505 km to 73.003 km.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
PEC.pdf
Tender Documents • 1.34 MB
BOQ_572830.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid