Loading…
Loading…
1,540 results • Best match
Annual Rate Contract for Periodic maintenance of pipe line and pump set for RWSS Barjangsar under division Sardarshahar
7.1.1 Maintenance of pipelines (upto dia 300 mm)for Rural water supply schemes irrespective of material which includes Repairing of Bursts & leakages pollution control, survey & removal of choking, disconnection of illegal connections, Collection & recording residual chlorine samples (as directed by engineer incharge) during daily supply timings, interconnections and all works related to pipeline network in existing distribution /rising main pipe lines of all sizes by digging out suitable size of pit in soft and loose soil/ hard soil including cutting of Black top, WBM & CC top of road of any size at work site. incase of Kharanja road/ concrete block road , bricks / blocks of concrete are to be removed and after removal of leakage same shall be placed properly and making road in good condition.This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and refilling of pit by excavated sand by ramming it at sides of pipes and upto ground level. For entire job contractor will use their own T & P. Contractor with his own resources shall arrange de-watering,JCB & Tractor compressor if any and restore any amenity at his own cost damaged while performing the work in this item. The work includes daily patrolling and repair the leakages within stipulated time and complete maintenance of pipe line network of rising and distribution pipeline network . work also includes daily/ periodical operation of valves of rising and distribution pipeline network within the scope of work for maintenance of pipe line per KM per month. Jointing material shall be provided by the department.
Annual Rate Contract for Periodic maintenance of pipe line and pump set for RWSS Jaitsisar under division Sardarshahar
7.1.1 Maintenance of pipelines (upto dia 300 mm)for Rural water supply schemes irrespective of material which includes Repairing of Bursts & leakages pollution control, survey & removal of choking, disconnection of illegal connections, Collection & recording residual chlorine samples (as directed by engineer incharge) during daily supply timings, interconnections and all works related to pipeline network in existing distribution /rising main pipe lines of all sizes by digging out suitable size of pit in soft and loose soil/ hard soil including cutting of Black top, WBM & CC top of road of any size at work site. incase of Kharanja road/ concrete block road , bricks / blocks of concrete are to be removed and after removal of leakage same shall be placed properly and making road in good condition.This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and refilling of pit by excavated sand by ramming it at sides of pipes and upto ground level. For entire job contractor will use their own T & P. Contractor with his own resources shall arrange de-watering,JCB & Tractor compressor if any and restore any amenity at his own cost damaged while performing the work in this item. The work includes daily patrolling and repair the leakages within stipulated time and complete maintenance of pipe line network of rising and distribution pipeline network . work also includes daily/ periodical operation of valves of rising and distribution pipeline network within the scope of work for maintenance of pipe line per KM per month. Jointing material shall be provided by the department.
Carrying out Preventive / Schedule and breakdown maintenance of 220/132/33 kV Grid Sub-Station, Govindpur, Dhanbad for the period from 01.06.2026 to 31.03.2027
Maintenance / Emergency Maintenance of Grid Substation as per schedule and JOB provided by Engineer In-charge.
APPOINTMENT OF PROOF ENGINEERING CONSULTANT (PEC) FOR Construction of Distribution system for 12155.80 Ha. of CCA including Command Area Development (CAD) of Salandi Left Main Canal from RD 45.570 km to 49.810 km through UGPL
Follow-up and vetting of Re-engineering works required to be done by EPC contractor for actual site condition for distribution network and CAD & WM works for 12155.80 Ha. and micro irrigation for 1216 Ha of Salandi Left Main Canal from RD 45.570 km to 49.810 km.
as per BOQ
Deployment of 1 No. Fitter for smooth running of the scheme i.e. Repair and maintenance of rising main, distribution network and miscellaneous work etc.of WSS Bateda Kaflon under JSV Sub Division Baggi No.II complete job in all respect with in all leads and lifts as per direction of the Engineer-in-Charge.
JITGARH ESTIMATE FOR CONSTRUCTION OF INDEPENDENT CANAL BASED WATER WORKS AND LAYING THE DI PIPE LINES IN VILLAGE JITGARH DISTRICT JIND.
Working out quantites of each structure as per HSR, uploading Rough and Detail estimate at HEWP, Preparation of DNIT, layout plan and detailed drawings of various structures for augmentation of water supply scheme showing the proposed Distribution network and water works structure as per DPR complete in all respect. Supply of 5 No. colored sets of each drawing.