Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹47 LAccepted-AOC 5TH FLOOR KAILASH BUILDING 26 K G MARG CANAUGHT PLACE CENTRAL DELHI DELHI 110001 | NEW DELHI | DELHI | 110001 | L1 | Accepted-AOC 1ST LOWEST | |
| 2 | L2₹71.5 L+₹24.5 L (52.1%)Rejected-AOC | L2 | Rejected-AOC 2ND LOWEST | |
| 3 | Rejected-Technical 701 HARBHAAJAN BUILDING CST ROAD KALINA SANTACRUZ EAST MUMBAI 400 098 | MUMBAI SUBURBAN | MAHARASHTRA | 400098 | - | Rejected-Technical Not qualify in technical evaluatio | |
| 4 | Rejected-Technical DCB 119 120 121 1ST FLOOR DLF CYBERCITY IDCO INFOPARK CHANDAKA INDUSTRIAL ESTATE PATIA BHUBANESWAR KHORDHA ODISHA ODISHA 751024 | KHORDHA | ODISHA | 751024 | - | Rejected-Technical Not qualify in technical evaluation | |
| 5 | Rejected-Technical | - | Rejected-Technical Not qualify in technical evaluation |
| Sl No | Description | Qty | Unit | Samarth Engineers L2 | WAPCOS LIMITED L1 |
|---|---|---|---|---|---|
| 1.00 | Providing Proof Engineering Consultancy Services for vetting the planning & design, report & drawing etc. as per the agreed plan
based on the submission of plan of the EPC contractor. The services shall be provided complete in all respect required for
procurement & construction of UGPL network for achieving the desire command area successfully for 12155.80Ha. of Salandi
Left Main Canal from RD 45.570 km to 49.810 km including submission of Report. | 1 | Nos | 50,05,000 ₹50,05,000 | 39,00,000 ₹39,00,000 Lowest |
| 2.00 | Follow-up and vetting of Re-engineering works required to be done by EPC contractor for actual site condition for distribution network and CAD & WM works for 12155.80 Ha. and micro irrigation for 1216 Ha of Salandi Left Main Canal from RD 45.570 km to 49.810 km. | 1 | Nos | 21,45,000 ₹21,45,000 | 8,00,000 ₹8,00,000 Lowest |
Tender Value
Refer Docs
EMD Value
₹1.5 L
Closing Date
18 Nov 2025, 5:00 pmClosed
CCE, ABP, SALAPADA
CCE, ABP, SALAPADA
APPOINTMENT OF PROOF ENGINEERING CONSULTANT (PEC) FOR Construction of Distribution system for 12155.80 Ha. of CCA including Command Area Development (CAD) of Salandi Left Main Canal from RD 45.570 km to 49.810 km through UGPL
2025_CCEAB_120262_1
CCEABP- 13 of 2025-26
National Competitive Bid
Consultancy Services
Lump-sum
810 days
O/O CCE, ABP, SALAPADA
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹1.5 L
Yes
18 Mar 2026
29 Oct 2025
19 Nov 2025
29 Oct 2025
18 Nov 2025
29 Oct 2025
29 Oct 2025 - 4 Nov 2025
Amount
Providing Proof Engineering Consultancy Services for vetting the planning & design, report & drawing etc. as per the agreed plan based on the submission of plan of the EPC contractor. The services shall be provided complete in all respect required for procurement & construction of UGPL network for achieving the desire command area successfully for 12155.80Ha. of Salandi Left Main Canal from RD 45.570 km to 49.810 km including submission of Report.
Follow-up and vetting of Re-engineering works required to be done by EPC contractor for actual site condition for distribution network and CAD & WM works for 12155.80 Ha. and micro irrigation for 1216 Ha of Salandi Left Main Canal from RD 45.570 km to 49.810 km.
Samarth Engineers (BID ID -3222116)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
PECBID.pdf
Tender Documents • 0.76 MB
BOQ_559422.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .