Loading…
Loading…
1,487 results • Best match
OPERATION and MAINTANANCE OF ELECTRICAL DISTRIBUTION NETWORK FOR ALL KMC LABOUR QTR and STAFF QTR UNDER BR-VI KMC
SPECIAL REPAIR TO LT DISTRIBUTION NETWORK SYSYTEM FROM MAG-23 TO CLP-A AT DAPPAR UNDER AGE (I) DAPPAR
Supply,laying/fixing, jointing,testing and commissioning XLPE insulated, armoured heavy duty electric cable with aluminium conductor, 1100 volts grade, cross-sectional area 10 sqmm 2 core laid in trenches/ducts/pipes/fixed on wall/pole etc complete all as specified and as directed.
REPAIR, REPLACEMENT AND MAINT OF RISING MAIN, DISTRIBUTION EXTERNAL PIPELINE NETWORK AND CONNECTED ALLIED ITEMS AT AF STN MOHANBARI
REPAIRS MAINT OF LT DISTRIBUTION NETWORK INCLUDING CABLES, JOINTS AND ACCESSORIES IN RA AND DEPOT AREA UNDER GE PULGAON
Supply and fixing Double wall Corrugated High DensityPolyethylene (HDPE) pipe of 50 mm sizes as per IS 14930 (Part-2):2001, Laid in trenches/floors and fixed on walls/poles, with and including necessary fittings such as bends, sockets and other connected accessories etc., for laying of electric cables, complete all as specified and as directed by EIC.
GE/863/EWS-T-106 OF 2025-26 SPL REPAIR TO WATER SUPPLY DISTRIBUTION NETWORK AND CONNECTING ITEMS AT
LAYING, HDD AND ASSOCIATED WORKS OF STEEL PIPELINE UNDER RANCHI GA FOR CITY GAS DISTRIBUTION NETWORK (1 YEAR ARC)
16. Contractor shall ensure that no tree/plant cutting shall be carried out during Pipe Line Laying operations.Trenching shall be carried out manually if needed, so as to ensure no damage to plant/tree/OFC /water pipe line /foreign pipeline/telephone line/sewage line/electric cable and other under ground utilities. 17. Payment for items above under pipeline laying in all type of Rocky strata including hard rock of single piece exceeding 1.5 meter in any direction within the trench dimension with respect to length, width & depth and removal only by pneumatic chisel/ drill/ rock-breaker.Trenching in rockey starta shall be done by rock breaking tool / rock hammer. Supply and installation of padding materials (i.e, sand / soft soil) shall be done as per direction of EIC. Bidder to quote accordingly. 18. Bidder has to familiarise themself the entire pipeline route and all locations /region/ charge area within the GA and ascertain all type of eventuality/uncertaintity before qouting their bid.