Loading…
Loading…
11,766 results • Best match
Renovation and repairing work to R.H.E. Club Road for C type 03 nos. Block with necessary wood works, cementing works, painting works, flooring work at Kitchen and toilet etc. and allied internal and external S and P work.
During monsoon, rainwater flows along the road instead of draining away that causes difficulties for both pedestrians and vehicular traffic. So this work provides proper drainage facility on both sides of this road
Development of Road from Sonamura Boxanagar Road to Adharsha Colony PMGSY road via Kapalipara to Sonamura Boxanagar road (L 2.348Km) SH WBM 3 Carpeting Seal coat pucca drain protection work and other allied works
Construction / Upgradation of Road/ CD works including maintenance for Five Year after construction. RBR-Bridges
Road/Bridge Work
Construction / Upgradation of Road/ CD works including maintenance for Five Year after construction. RBR-Bridges
Road/Bridge Work
Link Road between Hatuganj Basuldanga Road and Gurudasnagar Railway Station to Diamond Harbour Road from 1.00 Kmp. to 2.70 Kmp. in stretches, Repairing Work under Diamond Harbour Highway Sub-Division of Diamond Harbour Highway Division.
Emergent repair work by providing jhama metal at different stretches in Pandabeswar-Samla Road 0.50 to 1.50km of Asansol Highway Sub-Division
... 404 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). ...
Interlocking Road Construction Work Main Road to GPS Bandhkapura Pahari
Interlocking Road Construction Work Main Road to Aanganwari Side Kashipura
Interlocking Road Construction Work Main Road to GPS Bhagatpura Gudla