Supply scheme for caps at pangong. laying and fitting of 75mm and 90mm HDPE, g.i 80mm PPR pipe line and drilling of 8 inch dia borewell for installation of solar submersible pump at maan pangong Under SDP
Design, Supply and installation testing and commissioning of 10-15HP dual solar submersible pump, (Grundfos or equivalent parameter specification and Properties) discharge of 5 LPS and hgead of 96Mtr .Nominal operating cell temperature (NOCT : 45+/- 20 C), Temperature Co-efficient at NOCT (-0.286 to 0- 4), Maximium power at NOCT, Maximium power at STC, Performance Ration (79% to 82%),Module Efficiency (21 or more), Required system peak output power (with module orientation-south ) 400Wp or above, Capacity per module, Type of Module (Nano perc) Nmber of cels in each module (as per provide)., Certification Standards (Compliance as per specifications), Number of modules (as per provider), IP rating for Module (IP 67), Weight (Kg) and size (LXHXWmm) of each module (as per provider), IP rating for VFD and DB (IP 54 with additional encloseure/ IP 65), Solar Cell Material (Mono perc), Percentage of depreciaition in performance (as per provder), Minimum ower generation )(____)KWh/sq.M/Dy, Product Warranty (Vendor to declare), PV Module (Minimum 12 years), VFD (minimum 2 Years), Installation Warranty (minimum 2 years), System Performance guarantee (minimum till break even) RIO/ Beak even (Years),TCO in INR (20 Years) (Indicate "-ve" for benefits), DP (Years), Note: Vendor shall be responsible for solar power generation, Solar PV modules, Stainless steel solar submersible pump and motor, Motor controller, GI Mounting structure set, DC cable as persite requirement, Cable AC as per site requirement, Safety rope as per diameter of pump, Chain pulley of 1 ton capacity. The job also include any other Civil/ Mech. item required to make the system functional
OGSEP, PumpHouse Civil and allied works for construction of RCC Over Ground Solar Evaporation Pond, Pump House, RCC Tanks and other misc. works at Zirconium Complex, Pazhayakayal, Tuticorin.
OGSEP, PumpHouse: Civil and allied works for construction of RCC Over Ground Solar Evaporation Pond, Pump House, RCC Tanks and other misc. works at Zirconium Complex, Pazhayakayal, Tuticorin. TENDER NOTICE NO.: C/1437/2026
Design, Supply, Installation and Commissioning of 2KW, 5KW and 10KW on-grid Solar Roof Top PV power plants for an aggregated capacity of 46705 KW for 9937 Nos. Schools with Topcon solar modules with Normal structure with RMS in 33 Districts with 5 years comprehensive maintenance in the State of Telangana.
Providing and Fixing Solar Pump Construction of One Room Pumping out of Water Pond to gull main road and Ambedkar road. Interlocking tiles work in village-Sabotta Mustafabad, YEA WC-06
Earth work in rough excavation , banking excavaated earth in layers not exceeding 20 cm in depth, breaking clods watering, rolling each layer with 1/2 tonnes roller or wooden or steel rammer and rolling every 3rd and top most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, all leads as per ( A.R. ) For all kind of soil.
Installation of Solar system irrigation water pump at Kawsar Ali land at SansadAjmatpur under Habaspur GP JL No 55 HabaspurMouzaHabaspur (Activity Id 109944241) (AAP No-11/2025-26 )
Installation of Solar system irrigation water pump at Kawsar Ali land at SansadAjmatpur under Habaspur GP JL No 55 HabaspurMouzaHabaspur (Activity Id =109944241) (AAP No-11/2025-26 )
REPAIR/MAINT OF RTU FOR VISIBILITY OF GENERATION TO SLDC FOR REAL TIME MONITORING AS PER REQUIREMENT OF SLDC FOR GRID CONNECTIVITY OF 5 MW SOLAR POWER PROJECT AT CME UNDER GE (CME) KHADKI
Leased Line Services : Renewal/ Recharge and management of leased line connectivity for one year between the CME RTU/Modem and the SLDC Airoli , Navi Mumbai facility. This connectivity is required for the transmission of the prerviously implemented 21 data tags using the IEC 60870-5-104 (IEC 104) protocol and all as complete specified and directed by Engr in Charge Note :- 1. Renewal to be done within one month from date of the work order . 2. Generation data Visibility Report from SLDC Airoli to will be submitted to Engr in Charge . 3. In case of delay in REnewwal of leased line connectivity , A penaly of RS 500 per day after 30 days of commencement of work shall be levied and the same shall be recoverd from Contractor .