Loading…
Loading…
1,291 results • Best match
SPECIAL REPAIR TO BLACK TOP ROAD AT CERTAIN POCKETS AT BHALUKMARA UNDER JORHAT MIL STN.
Supply and fix in repair solar cat eye aluminium alloy shall (100% water proofing design according to 65) of size 125mm X 125mm X 25mm (shank 65mm) of high efficiency Mono rystafie solar panel 2.4 V/0.3 watt one NI-ed rechargeable battey (1.2V/ 1600MA) consisting of super brigh LED with 10,000 to 18,000 mcd complete as per manufacturers instructions etc. all as specified and directed.
REPAIR/ MAINT TO CERTAIN PATH, HARDSTANDING AND ROADS FURNITURE AT KALKA UNDER GE (I) JUTOGH
S&F solar cat eye aluminum alloy shall (100% water proofing design according to 65) of size 125x125x25mm (shank 65mm) of high efficiency Mono rystafie solar panel 2.4V/ 0.3 watt one NI-ed rechargeable battery (1.2V/ 1600MA) consisting of super bright LED with 10,000 to 18,000 mcd, complete all as specified and directed.
CONSTRUCTION OF MULTIPURPOSE SPORTS COMPLEX AT PATEL NAGAR, SECTOR-05 UIT SCHEME, BHILWARA, RAJASTHAN
Supply,Installation,Testing & Commissioning of 40 Kw Solar ON-Grid Power Plant 1.550Wp Bifacial half-cut Solar Panel (Non DCR)(Make :-Waree/Adani/Vikram/Tata)-18Nos 2.Dual MPPT Inverter 40Kva Ongrid-3Ph(Make : Sungrow/Waree/Growatt/solis)-1 Nos 3.Module mounting structure from GI steel/ aluminium structures to fix the photovoltaic panels on the roof including profiles composed of extruded aluminium rivets with seal of an aluminium body and shank a neoprene rubber seal and all accessories and supports with walkway, Posmac C Channel solar structure, bearable wind speed 550MPA size 3mm clamps clamps 6063T3T5, min height 270mm with wind test certificates -1 Set 4.ACDB 4 Pole MCCB with SPD & DCDBwith SPD fuses and MC4 connector(Make:-Waacab/Havells/L&T)-1 Set
Supply, Installation, testing and commissioning of Nine Nos SMAs and One No Seismometer to replace existing non functioning units at Bhakra Dam
Solar panel :- 75 Watt / 12 Volt DC Solar Panel with Charge Controller and Battery 12 Volt/150 AH. (Back up for 24 Hours, Maintenance Free) (MR)
Construction of Community Centre on Khasra No. 0//78, 0//127 at Indri Road under C M Announcement scheme Code No. 29239 Dated 04/12/2025 Ladwa
[32.70.2]Supply Installation testing commissioning of Solar Photovoltaic grid connected roof top Plant conforming to MNRE specifications as amended, consisting of Mono/Poly Crystalline silicon solar cells, net metering facility, necessary protections, earthing, mounted on Aluminium/GI structure of suitable strength with following components complete as required:- (a) Solar Photovoltaic Module manufactured in India, conforming to IS 14286/IEC 61215, IS/IEC 61730-Part-1, IS/IEC 61730-Part-2. Solar Photovoltaic Module conversion efficiency shall not be less than 16.5%. PV modules used in solar power plants/ systems must be warranted for their output peak watt capacity, which should not be less than 90% at the end of 10 years and 80% at the end of 25 years. (b) Power Conditioning Unit (PCU) of 350-800 V DC Input voltage range and 400 V AC, three phase, 4 wire, 50Hz plus /- 2.5 Hz, output voltage suitable to generate AC (c) Power with efficiency not less than 97%, total harmonic distortion less than 3% and suitable for ambient temperature from 0 to 50 degrees C. The PCU shall adjust the voltage and frequency level to suit grid frequency (d) Data Monitoring System complete with accessories. (e) Fixing of Array junction box and Main junction box with IP 65 protection and termination arrangement for incoming and outgoing cable along with glands, lugs and other accessories etc. as required. (f) Lightning and surge voltage protection. (g) Connections and Interconnections by supplying and fixing required size XLPE insulated copper conductor 1.1 kV grade armoured power and control cables between solar modules, main power cable to grid supply PCU unit along with supplying and fixing of necessary channel/conduit lugs and other accessories etc. as required. 2. Above 10 kWp and up to 100 Kwp [Through Rate]
Construction of New Model Sub Registar Office at Radhanpur Dist-Patan (2nd Attempt)
Tied Solar Power Plant with