Loading…
Loading…
1,448 results • Best match
DEMOLITION OF EXISTING GSR, PUMP HOUSE AND CONSTRUCTION OF NEW GSR, PUMP HOUSE, WITH NECESSARY COMPONENTS AT CHANNI JAKATNAKA WATER HEAD WORK, VADODARA.
Power Plant with Solar Panels (ALMM approved): Frame Material : Anodized
Construction of Type B and C Flat at Fisheries Campus Doranda, Ranchi
Supply, Installation, Testing and Commissioning of ongrid Solar Photovoltaic Power Plant conforming to MNRE specifications as amended, consisting of Mono Crystalline silicon solar cells, net metering facility, necessary protections, earthing, mounted on Aluminium/GI structure of suitable strength with following components complete as required:- a) Solar Photovoltaic Module of capacity 500 Wp or above, manufactured in India, conforming to IS 14286/IEC 61215, IS/IEC 61730-Part-1, IS/IEC 61730-Part-2. Solar Photovoltaic Module conversion efficiency shall not be less than 16.5%. PV modules used in solar power plants/ systems must be warranted for their output peak watt capacity, which should not be less than 90% at the end of 10 years and 80% at the end of 25 years. b) Power Conditioning Unit (PCU) of 350-800 V DC Input voltage range and 400 V AC, three phase, 4 wire, 50Hz +/- 2.5 Hz, output voltage suitable to generate AC Power with efficiency not less than 97%, total harmonic distortion less than 3% and suitable for ambient temperature from 0 to 50 degree C. The PCU shall adjust the voltage and frequency level to suit the Grid Voltage Frequency. c) Data Monitoring System complete with accessories. d) Fixing of Array junction box & Main junction box with IP 65 protection and termination arrangement for incoming and outgoing cable along with glands, lugs and other accessories etc. as required. e) Lightning and surge voltage protection. f) Connections & Interconnections by supplying & fixing required size XLPE insulated copper conductor 1.1 kV grade armoured power and control cables between solar modules, main power cable to grid supply PCU unit along with supplying & fixing of necessary channel/conduit lugs and other accessories etc. as required.
Installation of Jalminar at Yadav Mohallah under Tantri Panchayat.
(2) Provision of 1.0 HP DC Solar Motar pump set/water storage tank Provision & Installation ofSolar Powered submersible Auto run & Stop DC Pump Motor (900 Wp)of stainless steel suitable for minimum 125mmx115mm bore well operating head 60.00m discharge rate minimum 2000 LPH with lowering up to 57.00m suitable dia HDPE pipe &2.5sq mm x3core flat submersible cable of IS694:1190 including monol /Poly Crystalline PVC array (900WP) mounted on steel structure for storage water tank (5.00mhigh)in a suitable direction to optimize panel uses and withstand the wind pressure up to 200 Km/hour &making suitable arrangements to operated Hand pump manually in the same bore when there is no solar power including 5 years warranty against defects in materials and workmanship with locking arrangement of switch board . the system should be ECO-friendly.
SPECIAL REPAIRS TO LIVING-IN AIRMEN BILLETS AT AFA HYDERABAD
M&L for de-scaling incl cleaning of Solar Flat Plate Collector Panel, Solar Tank & arresting of leakages by using dummy gaskets, threaded flange/normal flange including testing complete all as specified & as directed for 500 LPD Solar Water Heater to the entire satisfaction of Engr-In-Charge.
Rajkiya Ambedkar Residential Girls High school (Cap-720) at Sheohar.
Supply, Installation, Testing and Commissioning of on grid Solar Photovoltaic Power Plant conforming to MNRE specifications as amended, consisting of Mono/Poly Crystalline silicon solar cells, net metering facility, necessary protections, earthing, mountedon Aluminium/GI structure of suitable strength with following components complete as required:-a)Solar Photovoltaic Module of capacity 330Wp or above, manufactured in India, conforming to IS14286/ IEC61215, IS/IEC61730-Part-1, IS/ IEC61730-Part-2. Solar Photovoltaic Module conversion efficiency shall not be less than16.5%. PV modules used in solar power plants/systems must be warranted for their output peak watt capacity, which should not be less than 90% at the end of 10 years and 80% attheend of 25 years. b)Power Conditioning Unit (PCU) of 350-800V DC Input voltage range and 400V AC, three phase, 4 wire, 50Hz+/-2.5Hz, output voltage suitable to generate AC Power with efficiency not less than 97%, total harmonic distortion
As per TD
Supply, installation, testing and commissioning of MNRE approved Grid tied Solar Panels with inverter, meter, cable etc. suitable for Rooftop installation as well as Utility Scale Solar Power Projects with 25 years of Linear Generation warranty. Work includes designing of solar panel area and MS frame and foundation on ground/roof of Pump house or CWR, showing arrangement of panel in available space, installation of PV module on MS frame as per approved design and drawings. Mounting structure shall be suitably designed to withstand wind velocity up to 150km/hr. Grid Tie Transformer less inverters, Multiple independent MPPTs, Peak efficiency of >98%. Connect up to multiple strings PV arrays, Easy & fast connection, Built-in string-level monitoring, IP65 protection level, Wi-Fi / internet based remote monitoring with 5 years warranty. All cabling up to panel and metre, earthing etc. required accessories and taxes are inclusive. The work shall be executed as per detailed technical specifications, approved drawing and direction of Engineer in Charge. Note: There shall be 5 year service warranty for panel, inverter, meter, cable etc. and suitable provision shall be included in tender document.