Remaining work of Electrification of station/service buildings, cover over platform, circulating area & approach road of stations and colony area, quarters provision of pumps and other work at Nagod, Phulwari, Devendra Nagar, Sakariya, Panna, Barkheda, Surajpur & Sabdua station and Supply, Installation, testing & commissioning of 33/11/.440 KV Substations with New Electrical connection at stations related with Satna - Panna - Khajuraho new BG Rail line project of Jabalpur division of West-Central Railway.
ERECTION Drilling of horizontal bore below Metre track by pushing method for laying of RCC/DWP pipe upto 450 mm dia. Total 2125340.00 Supply, erection, testing and commissioning of all in one solar street light 24W 24AH life PO4 60Wp- Item- 30 PVR S No. Item Description of Item Unit Qty Rate Amount No
CONSTRUCTION OF BUILDING FOR ECHS POLYCLINIC TYPE D AT PALI (NON MILITARY STATION) UNDER GE BANAR
Supply, installation, testing, and commissioning of a 9.81 kWp grid-connected rooftop solar PV system utilizing 144-cell Bifacial Mono Crystalline Half-Cut PERC modules rated at 545 Wp per module, coupled with a 10 kWp string inverter for high-efficiency energy conversion. The system includes a robust galvanized iron mounting structure designed to optimize sunlight exposure and withstand wind speeds up to 150 km/h. Additional components include high-quality DC and AC cables, DC and AC distribution boxes with surge protection devices, copper-bonded earthing, lightning arrestors, and ISI-marked UPVC conduits for cable routing. The setup integrates an internet-based remote monitoring system and bi-directional net metering to enable seamless energy management and monitoring. The project ensures compliance with IEC standards, and commissioning support to promote efficient and reliable solar energy generation for long-term sustainability, complete as per below specifications:
Approach road of small Bridge over Bishnupur Khal
sanction analysis rate Stand Alone Solar PV Street Lighting System: Configuration: Stand Alone Solar PV Street Lighting System (18W LED Light) a) 6 meter G.I. Pole b) 1 x 100 Wp Si PV Module. c) 1 x 42 Ah 12.8V LITHIUM FERRO PHOSPHATE (LiFePO4) Battery d) 1 x 18 W LED Luminaries Details: i) Supply of GI pole (Hot Dip Galvanized) of 3 mm thickness with 100mm dia. 6.0 metre length Pole with base plate 200 mm X 200 mm X 10 mm with RCC foundation. ii) Supply of 100 Wp Poly / Mono crystalline module with IEC 61215, IEC 6173-1, 2 compliance with any ISI MNRE approved. iii) Supply of 18 W Luminaries, comprise of:- a) 18 W LED (Philips/osram/ equivalent reputed make with BIS certificate) b) Charge controller and it should have over charge protection, deep discharge protection, Battery reverse polarity protechtion, Load short circuit protection, Open circuit protechtion, Panel reverse polarity protection, Over temperature protection. c) Automatic dusk to drawn controlling system to monitor LED operation. iv) Supply of 12.8 V, 42 Ah LITHIUM FERRO PHOSPHATE (Life pO4) Battery having BIS certificate. The batteries should have higher life expectancy, longer cycle life, low discharge rate and fast charging facilities. Battery should provide 12 Hrs battery backup. The battery must be provided with GI out door type battery box. v)Supply of Cables and Wires a) DC Cable 4 sqmm - 15 M. b) Control Cable - LS. vi) Transportation, Installation & Commissioning. vii) Comprehensive maintenance for 05 years (Minimum 01 (One) visit Quarterly)
8808/E8- REPAIR / MAINT/ REPLACEMENT STREET LIGHTS, PERIMETER LIGHTS, GARDEN LIGHTS, DECORATIVE LIGHTS AND CONNECTED WORKS AT NTS TEYLERABAD, MARCOS, NAD/DAD/CHOULDHARI PUMP HOUSE, FILTRATION PLANT, INS UTKROSH, RUNWAY PERIPHERY AND VAYU VIHAR AND
Taking down and dismantling of existing pole mounted luminaires of any types (Garden lights,high mast light,Flood lights,Gate lights,Street lights,Decorative lights,Solar lights,post top lanten) including disconnection and cleaning corrosion to all spares (bolts,clamps,brackests) with preventing to rapid rusting treatment.replace a LED drivers for maintaining to IP 66 rating integrity,external surge protection devices for over- voltage protection. and suitable size of LED module board, terminal blocks, flexible wires,UV stabilized covers for specific luminaire models etc complete all as specified and as directed by Engr-in-Charge.
REPAIR OR MAINTENANCE CLEANING OF UG SUMPS OH TANK SHALLOW WELLS STREET LIGHTS AND PERIMETER LIGHTS ALONG WITH ALLIED WORKS UNDER POCKET D E AND 42 WEU HQ SAC UNDER GE AF TVM
Disconnecting the old fitting along with battery from the solar light pole and supply, installation and testing new energy efficient solar street light fitting incl battery 30 Watt ,40 AH ,MPP charge controller and times with min two days backup of suitable for existing solar street light pole complete all as specified and directed. Note: Contractor shall summit the warranty of battery mimium 24 month.
CA NO.CWE BLY/GE (W)/62 OF 2026- 2027SPECIAL REPAIRS TO BITUMINOUS ROAD INCL PATH AT IBGH AREA, BHAGAT SINGH LINE, DCA and CERTAIN LOC UNDER GE (WEST) BAREILLY
S&F two way reflective Solar road studs (100% water proofing design according to IP-65) of dimensions 125mm x 125mm x 25mm (shank 65 mm) of high efficiency mono-crystalline solar panel 2.4V/0.30 Watt, one Ni-Mh of Ni-cd rechargeable battery (1.2V /1600MA), six super bright LEDs with 10000 to 18000 mcd (Millicandela) , view distance upto 1000 meters, flash rate 2 Hz and bearable weight of solar studs (10 Tone approx) with impact resistance aluminium alloy body with yellow/ red/ white/ green reflective panels and fixing the same on road surface by applying approximately 100 gm epoxy mixture and placing the cats eye without applying excessive pressure and fixed with 12mm dia and 120mm long zinc plated steel nail at the centre of cats eye complete all as specified and directed.