Loading…
Loading…
1,393 results • Best match
BUILDING AND ALLIED WORKS INCLUDING ELECTRIFICATION WORKS, HVAC, LIFT, ESCALATOR AND FIREFIGHTING WORKS ETC. IN CONNECTION WITH CONSTRUCTION OF INTERSTATE BUS TERMINAL (ISBT) AT SABROOM UNDER SOUTH TRIPURA DISTRICT.
Supplying & installation of All in one Solar Street light 40 watt (>150Lm/w,IP 66 ,LED life >50,000 hrs, 5000K,PIR,>100Wp,>36Ah) i/c necessasry connection etc as required or as per the instruction of the Engineer -in-charge:-
Zone-03 Rajapur Tiraha Myor Road se Minto Park hote hue Roadways Workshop hote hue Heera Halwai Chauraha ke paas tak sadak nirmaan karya aur PM Shri Rajkiya Inter College se Medical Chauraha hote hue Balson Chauraha tak sadak nirmaan karya.
Solar Power Road Marker The solar studs shall be made of aluminum alloy and polycarbonate material which shall be absolutely weather resistant and strong enough to support to load of 13,635 kg tested in accordance with ASTM D4280. Its color may be white, red, yellow, green or blue or combination as directed by the Engineer. Its water resistance shall meet the requirements of IP 65 in accordance with IS: 12063:1987 category 2 for the protection against water ingress. The dimensions of solar studs shall not be less than 100 mm * 100 mm * 10 mm. It shall have super bright LEDs so as the provide long visibility from a distance of more than 800 m. Its flashing rate shall not be less than 1 Hz. Its should be able to give the prescribed performance in the temperature range of -40 degree C to +55 degree C. Its life shall be not less than 3 Years. The rate shall include all material, labor, equipment's, fabrication, transportation erection, installation and incidentals all complete as per direction of the engineer-in-charge
Establishment Of Oil Processing Unit at Bandh Baretha Sub-Project Stage 1
Name: Solar Basic 10KW – On-Grid Solar Power Plant Description: Specs:PV Panel Make: Reputed Indian MNRE Approved Make Panel: Polycrystalline/Monocrystalline biffacial /topcon Wattage: 540-620 WP(NDCR) Inverter: Standard/Inverter type Inverter Type: On-Grid Inverter Capacity: 10 KW Structure: GI standrad ( height 6 feet)Balance of System: Included AC Cable: Polycab/Reputed – 30 meterDC Cable: Polycab/Reputed – 200 meter ACDB – 1 no IP rating IP65 or IP66 capacity 10KW,Three Phase, Voltage Rating 415V AC, Current rating 32A,UV Protected, Transparent Polycarbonate or ABS Box, AC ; MCB & surge protection device(SPD );A3 Plle ac 40ka Type 2 spd ; terminal blocks Copper Terminal Blocksfor secure AC connections, Cable Glands. All Accessories Included: Lugs, MC4 Connector etc.Earthing copper Electrode – 3 nos; Copper Bonded rods (40 mm dia, 1-2meter),Bentonite Chemical Earthing bag 10 Kg, Nut Bolt with -Washer 1 set, Ring Lug 1 No.Earthing cable– 50 meter, 6 sqmm dia ,conduction material : tinned copper ,insulation material : PVC colour : yellow / green ; spart test KV 6 (AC ) non bvreakdown , Rated temprature 70 dgree rated voltage 450/750 v , DC 1000V ,Europeon cpr : nCcca / Dca / Eca . according tot EN5057 Certificate of TUV / CE ,Construction (AWG)X B35n x mm2, conductor co instruction 494x.3n x2mm , conductor :8.8 mm Resistance max : .536 ohms/km , current carring capacity 218 A Lighthing arrestor : 1 nos , solar copper lighthing arrestor (upto 100 micron copper bonded ), solid rod with 14.2 mm diameter , dimension LXWXH 100X5X5 cm ,lighting arrestor blash plate , item weight 12 kg on GI stand METER / NET METERING -HPL /Equal STANDRAD OTHERS ;: transportation , transit insurance , 3 year warranty after 1 year from installation , 3 year annual maintence contract after 1 year fron installation , training 2 days , spare ,tool box etc ...
Reconstruction Of The Dilapidated Boundary Wall To Keep The Land Of The Free From Encroachment, Construction Of The Main Drain To Prevent Waterlogging, Main Road For Movement And Construction Of Residential And Sub-Divisional and Ziledaari Office Bui
Supplying, installation, Testing & Commissioning of the integrated type solar PV lighting system on the existing pole structure, comprising of 20 watt, 64 Mono Passivated Emitter and Rear Contact (PERC) Solar Panel (minimum efficiency 21%),, Pulse with modulation (PWM)/Maximum Power point tracking (MPPT) Charge Controller in the box with a sleek appearance and sturdy structure, is weather-proof, and is simple to install, With Lithium-Iron Phosphate Battery (LiFePO4) 3.2Volt (Cell) 24 AH battery, charging time 6-8 hours, Battery backup time 12 hours (minimum), LED fixture 20 watt, Input voltage: 12V DC, Operating temp range-15 deg to 50 deg centigrade, internal surge protection of 5 KV LN,E as per IEC 61000-4-5, Driver efficiency >85%, THD 10% as per IEC 61000-3-2, P. F20.95, IP-66,IK-08, CRI >80, under voltage and over voltage protection, Electro Magnetic Interference (EMI) Electro Magnetic Compatibility (EMC) As per CISPR 15, lenses for beam angle as per Illuminating Engineering Society of North America (IESNA) type I/II/II as per the width of the road and the project requirement, Correlated Colour Teesperature (CCT) 5700°K (6000°K (As per American National Standard Institute (ANSI Bin)), life time (LED, Driver & electrical circuitary) of 50K hours lamp buring hours till the 70% of initial (Part 1), for fixtures up to 60 watt LED light Complete with mounting structure for the battery and accessories and wind stonn withstand capacity as per the zone. (Thermal management heat sink of aluminium housing such that LED junction temperature shall not rise aboven 90°C) 35 Watt (System lumen efficacy >120 lm/Watt)
Canal Water Based Water Supply Project for Construction of 5.0 MLD Water Treatment Plant (WTP) and other related works incluidng 5 year O and M (Part 2) at Mallanwala Khas, Distt Ferozepur Punjab Under AMRUT 2.0 Scheme (E Tender 90)
v) Construction of supporting RCC columns for Solar Panel
Canal Water Based Water Supply Project for Construction of 4.00 MLD Water Treatment Plant (WTP) and other related works including 5 years Operation and Maintenance (Part-2) at Bhai Rupa Town, District Bathinda Punjab under AMRUT 2.0 Scheme
Canal Water Based Water Supply Project for Construction of 4.0 MLD Water Treatment Plant and other related works including Operation and Maintenance for a period of 05 years and Supplying, Installation, Testing of Solar Panels including other required equipment as per Guidelines of Punjab Energy Development Agency (PEDA) over Raw Water S&S Tanks of Water Treatment Plants with Operation and Maintenance for a period of 07 years