Loading…
Loading…
1,395 results • Best match
Annual maintenance and repairs of fabrication and erection of steel structural and roofing works for various plant buildings 2026-27
Supplying and fixing Turbine air wind ventilators 600mm throat dia with FRP / poly carbonite base and base with SS or Aluminium for roof & fixed with suitable size Zinc phosphated galvanised and polymer coated J or L bolts with washer and cap including cost & conveyance of all materials , loading & unloading charges ,all labour charges hire charges for tools and plants, dismantling and removing existing roof sheets for fixing ventilators, etc complete as per standard specification.
CONSTRUCTION OF 14MLD WTP WITH 5 YEARS OANDM AT DHURI NAME AS PER APPROVED DNIT
iii) Construction of RCC column for supporting Solar Panel : Dia. 300 mm
Construction of Institute of Driving Training and Research (IDTR Tier-1) at Jamshedpur, East Singhbhum
Supply, Installation, Testing & Commissioning of 1000 LPD ETC Type Solar Water Heating System complete with SS-304 insulated storage tank, ETC vacuum tubes, hot dip galvanized mounting structure, electrical backup heater, CPVC/GI insulated piping, valves, fittings, accessories, transportation, testing and commissioning as per technical specifications. Technical Specifications * Capacity : 1000 LPD * Collector Type : ETC (Evacuated Tube Collector) * ETC Tubes : 120 Nos. * Tube Size : 58 mm × 1800 mm * Storage Tank : SS-304 Stainless Steel * Insulation : 50 mm PUF * Outer Casing : Powder Coated GI * Mounting Structure : Hot Dip Galvanized Steel * Electrical Backup Heater : 6 kW * Water Temperature : 65°C to 85°C * Complete with valves, air vent, NRV, safety valve and accessories * Complete piping with insulation * Testing & Commissioning Included Warranty * Solar Water Heater System : 5 Years * Storage Tank : 5 Years * ETC Tubes : 5 Years * Structure : 5 Years
Canal Water Based Water Supply Project for Construction of 3.0 MLD Water Treatment Plant (WTP) and other related works incluidng 5 year O and M (Part 2) at Mudki Distt Ferozepur Punjab Under AMRUT 2.0 (E Tender 90)
v) Construction of supporting RCC columns for Solar Panel
REPAIR/MAINTANANCE OF DG SET OF VARIOUS CAPACITY IN AOR OF GE (EAST) UNDER GE (EAST) MATHURA
M&L for repairing and checking of serviceability to proper functional of Solar Power Generation Plant (Solar Three structure of capacity 5KW) including with check all electrical wiring connections of module with output voltage (Voc) string voltage and solar invertor, replace defective DC control wiring of module to module and invertor conection wiring as per existing and checking of module separately as per manufacturer recommendation to give proper functional, replacement of unservicceable MC 4 wire connector (Male & Femal) as per existing and replace faulty fuse connector & MCB from DC DB box panel complete all as per directed by Engineer-in-Charge. Note : Replacement of burnt control wiring of module, DC DB fuse connectors & MCBs, MC 4 connector, cable lugs, nut-bolts, thimble etc shall be deemed to be included in unit rate.
Fire Station to Bus Stand via Ambedkar Stadium and Gandhi Park and Janmanch to Old Gangoh Bus Stand on Ambala Road via Jal Nigam Office
Solar Power Road Marker The solar studs shall be made of aluminum alloy and poly carbonate material which shall be absolutely weather resistant and strong enough to support to load of 13,635 kg tested in accordance with ASTM D4260. Its color may be white, red, yellow, green or blue or combination as directed by the Engineer. Its water resistance shall meet the requirements of IP 65 in accordance with IS: 12063:1987 category 2 for the protection against water ingress. The dimensions of solar studs shall not be less than 100 mm 100 mm 10 mm. It shall have super bright LEDs so as the provide long visibility from a distance of more than 800 m. Its flashing rate shall not be less than 1 Hz. Its should be able to give the prescribed performance in the temperature range of -40 degree C to +45 degree C. Its life shall be not less than 3 Years. The rate shall include all material, labour, equipments, fabrication, transportation erection, installation and incidentals all complete as per direction of the engineer-in-charge