Loading…
Loading…
17,125 results • Best match
SUPPLY AND INSTALLATION OF ROOFTOP SOLAR PANEL AT RUDRAPUR GP OFFICE (1ST FLOOR), UNDER RUDRAPUR GRAM PANCHAYAT WITHIN DOMJUR DEVELOPMENT BLOCK
1 SUPPLY AND INSTALLATION OF ROOFTOP SOLAR PANEL AT RUDRAPUR GP OFFICE (1ST FLOOR), UNDER RUDRAPUR GRAM PANCHAYAT WITHIN DOMJUR DEVELOPMENT BLOCK BI01010001010000000000000515BI0100001113 0.000 Nos 0.871 Excess(+) Full Conversion INR
Repair/maint of DG Sets , AMF Panels, Solar Plants , Solar Street lights, Lt Panel earthing and other connected items at Anarwala under AGE E/M -II of GE Dehradun
Material and labour for cleaning of solar water heating system dismantled against item No 13 above and Servicing of solar water heater system by Cleaning complete tubes internally, Anti-scaling Cleaning of all effected parts . Removing any type of chocking of Solar Collector or tube, repairing any type leakage from Gasket, Rubber Washer after Cold Water inlet and before hot water outlet of Solar Water Heater with cleaning agent complete all as specified and directed.
Electrical Repairs, Pump Service, AC Service and UPS Service and Solar water heater Service to Judge Quarters at Kollegala(ST)
Electrical Repairs, Pump Service, AC Service and UPS Service and Solar water heater Service to Judge Quarters at Kollegala
Electrical Repairs, Pump Service, AC Service and UPS Service and Solar water heater Service to Old Judge Quarters at Gundlupet
Electrical Repairs, Pump Service, AC Service and UPS Service and Solar water heater Service to Old Judge Quarters at Gundlupet
Electrical Repairs, Pump Service, AC Service and UPS Service and Solar water heater Service to Judge Quarters at Chamarajanagara(ST)
Electrical Repairs, Pump Service, AC Service and UPS Service and Solar water heater Service to Judge Quarters at Chamarajanagara
PROVN OF ROOFTOP SOLAR POWER PLANT AT BUILDING OF HQ 787 (I) AD BDE CAMP UNDER GE DEHU ROAD
1 Supply, Installation, testing and commissioning of Roof top Solar Power plant 50 KW capacity with hybrid system including the following items detail for each job . (i) Solar PV Module Standards:- Mono Perc, 545 Wp. Each panel , Total Nos of panel 90 Nos.Specification:-IEC 61215/ IEC 61730 certified panel Make- Navitas/Waaree or equivalent. (ii) Module Mounting.Structure.Standards:-GI sections 50 x 30 chanel with purling with Aluminum combo sections and clamps alongwith other connected accessories. (iii) Solar Inverter.Standards:-Growatt/Sofar/Navitas/Waaree or equivalent inverters, IEC certified. Built in DC disconnect and AC disconnect as per Electricity board. Specification:- kW rating suited for system, with 3 phase output for 50 Kw Make- Navitas./Waaree or equivalent. (iv) Earth System specification IS 3043,standards as per IS Standard / NBC standard integrated to existing building earth strip or as suited , as per recommended manufacturer. cost of excavation and required materilas alongwith PVC pipe will be included in this job . connection ensure from DB to earthing and earthing test result should be less than 10 Ohm (v) ACDB/LT Control panel including change over MCB and MCCB as per designed . Make:-ABB / Citel / L&T. (v) DC copper cables,& AC aluminum armored cables from inverter to solar panel ACDB to main existing electric source along with all connected accessories . Make: Polycab. (vi) Remote Monitoring System.Specification:-Data logger / App based data with SIM . (vii) Zero net metering device to be installed for hybrid system. (viii) Battery Backup : lithium ion battery 48V 200Ah for excess energy storage upto 50 KWh along with connecting cable as per manufacturer design and make neccessry connection from inverter . Make Luminous /Exide /Waaree or equivalent. Note : (i) Contractor will be bounded to provide certificate of test result of solar Module, Test certicicate of materials , certificate of gurantee/ warrantee for the product from manufacture at the time of installation. (ii) If any items miss out but cumpulsry for installation cost included in quoted rate. (iii) Battery backup 8 hours with discharge of 70% of battery. 1 Each Excess(+) Full Conversion INR 1 Construction of chamber for 100mm sluices valve item1 10 1 Nos