Loading…
Loading…
1,278 results • Best match
Design, Supply, Installation and Commissioning of 2KW, 5KW and 10KW on-grid Solar Roof Top PV power plants for an aggregated capacity of 46705 KW for 9937 Nos. Schools with Topcon solar modules with Normal structure with RMS in 33 Districts with 5 years comprehensive maintenance in the State of Telangana.
Providing and Fixing Solar Pump Construction of One Room Pumping out of Water Pond to gull main road and Ambedkar road. Interlocking tiles work in village-Sabotta Mustafabad, YEA WC-06
Earth work in rough excavation , banking excavaated earth in layers not exceeding 20 cm in depth, breaking clods watering, rolling each layer with 1/2 tonnes roller or wooden or steel rammer and rolling every 3rd and top most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, all leads as per ( A.R. ) For all kind of soil.
Installation of Solar system irrigation water pump at Kawsar Ali land at SansadAjmatpur under Habaspur GP JL No 55 HabaspurMouzaHabaspur (Activity Id 109944241) (AAP No-11/2025-26 )
Installation of Solar system irrigation water pump at Kawsar Ali land at SansadAjmatpur under Habaspur GP JL No 55 HabaspurMouzaHabaspur (Activity Id =109944241) (AAP No-11/2025-26 )
REPAIR/MAINT OF RTU FOR VISIBILITY OF GENERATION TO SLDC FOR REAL TIME MONITORING AS PER REQUIREMENT OF SLDC FOR GRID CONNECTIVITY OF 5 MW SOLAR POWER PROJECT AT CME UNDER GE (CME) KHADKI
Leased Line Services : Renewal/ Recharge and management of leased line connectivity for one year between the CME RTU/Modem and the SLDC Airoli , Navi Mumbai facility. This connectivity is required for the transmission of the prerviously implemented 21 data tags using the IEC 60870-5-104 (IEC 104) protocol and all as complete specified and directed by Engr in Charge Note :- 1. Renewal to be done within one month from date of the work order . 2. Generation data Visibility Report from SLDC Airoli to will be submitted to Engr in Charge . 3. In case of delay in REnewwal of leased line connectivity , A penaly of RS 500 per day after 30 days of commencement of work shall be levied and the same shall be recoverd from Contractor .
Supply, Erection and Commissioning Of 9MTR Casted Designer Double Arm Pole With 120w X 2 Smart Led Light, 120w X 2 Iot Based Smart Solar Hybrid Light with CCMS Control Panel SITC for Shiv Murti Chowk Bus Stand Divider to Arya Nagar Chowk Haridwar in
Supply of P.U Painted 9 Mtr. Solar HyBrid Decorative Pole are made out of G.I Steel Tubes as per MS Base Plate Dia. OD 400 x 12mm, & Alu. With 200Watt x 2 Solar Panel & inbuilt 100Ah lithium ion battery Iron Casting on joint, inbuilt IOT Based controlling with Control Box at the bottom of the pole for space for Housing MCB & Terminal strip etc. Specification of Pole Sections: 1st Section 165mm (O.D) x 2000mm(Length) x 3.6mm (thickness) combined 2nd Section 84mm (O.D) x 5000mm (Length) x 3mm Grooved Pipe (Thickness) With Polyurthane Painted color shade Glossy (Black & golden/Copper Golden). Arm Section 60mm (O.D) x 2000mm(Length) x 3mm(thickness) As per Drawing With Arm Total length of pole is 9Mtr.
Facility Management Services - LumpSum Based - Gp DEWADI; Supply of solar high mast light 7 meter pole 24 watt for no of qty 3; Consumables to be provided by service provider (inclusive in contract cost), Facility Management Services - LumpSum Based ... of solar dual ... dual pump 1 ...
Facility Management Services - LumpSum Based - Gp DEWADI; Supply of solar dual pump 1 hp for no of qty 1; Consumables to be provided by service provider (inclusive in contract cost)