Loading…
Loading…
9,125 results • Best match
REPAIR/ MAINT OF STREET/ SECURITY LIGHT FITTINGS HIGH MAST LIGHTS, SOLAR STREET LIGHT, JETTY TOWER LIGHTS, TRANSIT LIGHT AND CONNECTED WORKS AT CORE AREA, OTM ACCN INCLUDING PATANJALI, MES COMPLEX, NSRY, PIER-L, KADAMBA VANAM, MANZIL CREEK, AMB
Taking down old defective/unserviceable gate light/bulk head/garden light/street light of any size or type and fixing only LED light fittings of any type or size including making necessary connection complete all as specified and directed. (Note : LED Light fittings will be issued under Sch ‘B’ free for fixing only).
SPECIAL REPAIRS/ REPLACEMENT OF BER CENTRIFUGAL PUMP SET AND VT PUMP AND SOLAR LIGHT (06 X SOLAR STREET LIGHTS) AT CLP-36 INSIDE DEPOT AREA AT CAD PULGAON
Disconnecting and taking down exiting unserviceable Street lights/flood lights any type/watts from pole/wall complete all as specified and directed. by EIC
SUPPLY INSTALLATION AND COMMISSIONING OF 6 NOS 30W SOLAR LED STREET LIGHTING SYSTEM AT VARIOUS PLACE UNDER 81/15 POLLING STATION AT SITACHANDRAPUR
eProcurement System of Government of West Bengal Created By: UTTAM ROY Created Date/Time: 19-Jan-2026 02:38 PM Tender Title: SUPPLY INSTALLATION AND COMMISSIONING OF 6 NOS 30W SOLAR LED STREET LIGHTING SYSTEM AT VARIOUS PLACE UNDER 81/15 POLLING STATION AT SITACHANDRAPUR Tender ID: 2025_ZPHD_955777_47
High Mast Lighting Octagonal Tower with Solar Based LED Street Light (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Past Performance, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2026/B/7113619 Dated : 15-01-2026 Bid Document 1/6, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Past Performance 80 % Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 11 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
High Mast Lighting Octagonal Tower with Solar Based LED Street Light (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
High Mast Lighting Octagonal Tower with Solar Based LED Street Light (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Past Performance, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2026/B/7113618 Dated : 15-01-2026 Bid Document 1/6, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Past Performance 80 % Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 11 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
High Mast Lighting Octagonal Tower with Solar Based LED Street Light (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
High Mast Lighting Octagonal Tower with Solar Based LED Street Light (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Experience Criteria, Past Performance, Bidder Turnover, Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2026/B/7133568 Dated : 21-01-2026 Bid Document 1/6, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Past Performance 50 % Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 9000 ePBG Detail Required No (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. 2/6 Beneficiary : Commandant bijapur cg, Home Department Chhattisgarh, Chhattisgarh Police, (The Commandant 15th Bn Caf Bijapur C.g.)
High Mast Lighting Octagonal Tower with Solar Based LED Street Light (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No