Loading…
Loading…
3,818 results • Best match
Supply, installation, testing and commissioning of electro-mechanical equipment at water supply scheme Dachnimall (Stage 1st and Stage 2nd) of Jal Shakti (PHE) Mechanical Division South Awantipora under JJM.
Providing, installation, testing and commissioning of area lighting 120 Watt LED (Street Light Type) on top of octagonal pole. Having following specs: Input: 90-240 V 50 Hz Power Factor: >0.9 Colour Temperature: 4K - 6.5K Beam Angle: 120˚ - 170˚ Lumens: >12000 Operating Temperature: -20˚C to 60˚C The LED is pressure die cast aluminum housing with power coated finish and having Ingress Protection up to IP-68. The LED is properly fitted on the arm of the pole and connected to the copper wire as provided in the high mast pole.
Construction of Players Changing rooms and laying of synthetic artificial turf for existing Futsal Ground at Tivrem Orgao, Marcel, Goa
Supplying and erecting integrated LED street light fitting 85-90W IP65 & IK08class having single piece pressure die-cast aluminium housing. having systemlumens output of Min. 9300 Lumens, min efficacy of 110 lumen/W, CRI> 70,CCT upto 6500k, THD10%, p.f > 0.95, operating range of 140-270V, inbuiltsurge protection of 10 kV, Life class of 50,000 Hrs at 1.70B50 including drivercomplete with minimum 2 Years warranty of make Wipr/Lighting Technologies/ Kasper T Net/Philips
Development of Govt Lake at Sy No 216/12 near Devipura Temple at Talapady under Ullal Taluk
Supply and erection of 14 Feet Height Street Light Pole 14 Feet Height Street Light Pole on suitable cement concrete foundation with 2.5 Feet height dia 95 mm cast iron decorative round pedestal as pe...
DEVELOPMENT OF A NEW HEAT DEVELOPING ILLUMINATION SYSTEM AT THE CHLORINE TONNER ROOM TO MAINTAIN THE DESIRED TEMPERATURE OF THE CHLORINE TONNER DURING OPERATION, ALONG WITH OTER ELECTRICAL WORKS AT THE LABORATORY AT WTP-1, GRWW
SUPPLY AND FIXING OF SMART BRIGHT ESSENTIAL STREET LIGHT COMPLETE WITH ALL ACCESSORIES TO BE FIXED/PROJECTED FROM THE WALL OF BUILDING OR ON POLE INCL. MAKING HOLES/ PROVIDING CLAMP ARRANGEMENT & NECY. GI REDUCER AS REQUIRED. S7F 40 MM GI PIPE (ISI-MEDIUM) QUALITY 1.5 MTS. AVERAGE LENGTH HAVING SUITABLE BEND S&F NECY. LENGTH OF 1.5 SQMM PVC INSULATED SINGLE CORE STRANDED ANNEALED COPPER WIRE AND MAKING CONNECTION AS REQUIRED AND MENDING GOOD DAMAGES TO WALL INCL. PAINTING ETC. REF: IRRIGATION & WATERWAYS DEPARTMENT- 2022
) Imp.Estimate for proposed 2 nos 25 KVA DT to aviod over load in Thadikkarankonam SS I 250 KVA in Yehova Charch SS
Street light Switch point arrangement
Imp.Estimate for proposed 2 nos 25 KVA DT to aviod over load in Thadikkarankonam SS II 250 KVA in CMS school SS 25 KVA and Veerapuli SS III under Azhiyapandipuram section
Street light Switch point arrangement