Loading…
Loading…
3,757 results • Best match
Building works/ Building maintenance works with structural steel and Metal Sheet roofing items.
Supply, installation, testing & commissioning of LED Post Top light fixture similar to Primus of M/s Lighting technology ( in asthetics & looks) having- min 4500 lumens , min efficacy 75 LPW ,Pressure die cast aluminium alloy with powder coated solid metal frame, IP-66, CRI-80, Polycarbonate diffuser, IP connector & with required SS hardware, on existing pole all as required & instructed by E-I-C.Scope of work include fabrication, supply & installation 3M high 75 mm dia (OD) (65 NB) MS pole made out of class B (Medium Duty ) pipe with 200 x 200 x 10mm base plate, 4 nos webs, Hot dip galvanizing & PU coating of approved color matching to Post top fixture. The cost of pole shall include the cost of RCC foundation , SS foundation bolts, anchor plates, nuts, washers, min 2 nos. HDPE PLB pipe 40/33 mm dia bend to shape approx. 1 m in length, & including excavation in all types of soil/foot path cutting , temporary reinstatement, back filling, dewatering, consolidation, disposal of excess earth within the radius of 3000 m and making good to the original finish etc as per enclosed detailed specifications & drawings (Standard drg. of foundation detail for street light pole Drg. No.: DCSEM/SDS/STD. DRG./STREET LIGHT POLE-01/8719), as required to complete the work in all respect as per instructions of the E-I-C. Note : 1) Scope of work also includes madifiaction as require to make the pole suitable for installation of Post to LED light Fixture. 2) Sample pole / drawings shall be got approved from department before fabrication.
Shifting of Transformer S.G-02 Sector-63, Noida
Dismantling of pole/ street light standard/ strut embedded in cement concrete foundation etc. as required. Complete in all respect as per direction of E/I. (DSR-2018, 12.42)
Special repairs including all Civil works, Internal and External Electrical works DG Sets Substation equipments and Plumbing and Drainage works of CBI H.Q Building, New Delhi
D.G sets/Substation & Distribution system.Compound Lights, street lights, feeder pillar and all
Impvt. of Gopapur Sasanga Road from Ch. 0.00 km to 5.764 km under Baramba Block in the Dist. of Cuttack for the Year 2025-26.
4C×35 mm² (P)+1C×35 mm²(M)+1CX16 mm²(Street Light) (LT AB Cable)
PROVN OF TOILET BLOCKS AT HALLOMAJRA AND DRIVERS REST ROOM,TOILET BLOCK, SECURITY LIGHTS AT N AREA UNDER GE CHANDIGARH.
Plastic rectangular Sintex SMC/FRP Junction Box for street light pole including MCB 6 Amp and terminal with M.S. clamps, nuts, bolt and washer of approved size for LT Pole for street light pole box.
GENERAL-MI Class I-LI schemes in wayanad- Construction of Nanjoth LI Scheme in Edavaka Panchayath, Mananthavady constituency, Wayanad District-Electrification-General Electrical Work
90.15.4.1:Supply Conveyance, installation, testing and commissioning of 20W LED street light output greater than 105lumen/W 4000-6000 K with IP 66 protection LED Chip make Cree/Lumilled/Nichea with power factor greater than 0.95 at full load, internal surge protection up to 8 KV,and Aluminium pressure die-cast Powder coated housing,acrylic cover complete with THD Less than10%, power factor greater than 0.98, RoHS compliant, duly wired up for use on 230 V AC supply. Driver compartment should be seperatly accessible for maintenance (LM 79&80 certificates from NABL accredited Third party lab to be produced mentioning chip manufacturer)