Loading…
Loading…
592 results • Best match
Strengthening work of Ravindranagar emanating line Chhitauni to khadda emanating line and 33 kV khadda line Distt Kushinagar
Making cable stand (Including Erection Grouting) of 02 No. top Channel in transmission switchyard with all required materials.
Tender for Providing new 63 KVA 11 0.4 KV Sstn Lakhanpur at Patta Aw 11KV HT Line and re organisation of LT Line for voltage improvement in Electrical Section Changer under Esd No 2 HPSEBL Bilaspur
Erection of Sub-Station structure, muff with C.C. muffing 1:2:4 ratio, C.I. X-arms 4 Nos size 2800*100*50mm for top fitting and Trans base main channel, 2 Nos CI-X-arm 460*100*50mm for supporting and GO switch handle, 4 Nos AI-X-arm 2800*75*40mm for GO switch and DO Fuse unit, A.I.-X-arms 2800*50*50mm 2 Nos for Trans belting and 2 Nos for LT panel box etc, AI 460*35*35mm for bracing of Trans bed, Strain Insulators,Pin Insulator,bend stepple, ball cleave eye socket, D.O. fuse unit, full and half clamps, MS nuts and bolts off sizes, barbed wire Erection of 63 KVA, 11/0.4 KV transformer, Poles, MCCB for 100 KVA s/Stn, LT cable 3.5 core 70 mm, stay set ,stay wire,G.O Switch,discs Insulator,LA's, S/stn earthing, danger plate,energy meter and Allu paint to all metal parts, jumpering etc.complete in all respect.
18/SE(T)AMAUSI ZONE/2026-27
Pipe boring type earthing minimum 20 meters deep from ground level or up to water level which ever comes first with "B" class G.I. pipe having 2" diameter, construction of chamber with cover for pipe type earthling, connecting bore type earthing with equipments with G.I. flat 50x6 mm by arc welding as per requirement in the switchyard as per department norms (material to be provided by the contractor)
Work of erection of 66KV equipment, Structures, Control wiring, Yard Lighting, Control-Room, Staff-Quarter Electrification & Supply of Furniture etc at 66 kV Kapodara SS under construction Division Bharuch
TECHNICAL PARTICULARS FOR ERECTION OF EQUIPMENT AT SUB-STATION
Interception and Diversion of Nallahs with STP works Project of Patera town under SBM 2.0
1. Construction of 1 Nos. Interception Diversion Structure 2 Nos of Road Gully Chamber. 2. Survey, Design and Construction of 500 m Length of RCC drain. 3. Survey, Design and Construction of Sewage treatment plant of installed capacity 0.60 MLD and all appurtenant structures and allied works. 4. Providing, Laying & Supply of 150mm diameter pipeline comprising of DIK7 pipe having length of 200 m for Pumping wastewater from pumping station to STP including survey, design, construction of 1.0 No. of Pumping stations and all appurtenant structures and allied works. 5. Reuse of the Treated Sewer for the Green Space and agricultural purposes comprising of DIK-7 pipe of 100mm diameter having the length of 50 meters of distribution pipe. including survey, design, construction of 50 kl sump & Pump of appurtenant structures and allied works. 6. Planting of Trees and their Maintenance for one Year in 0.60 m Dia holes and maintaining the plants. 7. Providing and laying of HT Feeder having the length of 3.00 kms and 2 nos. Electrical Substation. 8. Construction of 2 nos of Sand Gravel Filter structure Capacity of volume of sewage from 150 KL to 300KL, along with soak pit. 9. Providing, installing, testing, and commissioning of Online Continuous Monitoring System (OCMS) for monitoring water quality characteristics before and after treatment, complete with analyzers, data logger, and remote data transmission.
Installation of 11 Nos New Distribution Transformers 100/250 KVA Work at different places in the work area of (Assistant Engineer 11KV LT Goyel Chauraha) of 33/11 KV Substation, Purania Goyel Chauraha
Fabrication, erection of sub-station type double pole 11 mtr. Long ST pole along with fixing of necessary clamps. Accessories required including supply & fixing of straight MS 100x50mm top channel (2240mm long) one no. dropper channel/Angle 100x50 mm 2 nos. with arrangement of fixing 3 nos. pin insulator , painting of pole , danger board, number plate,barbed wire , as per RESPO specification and direction of E/I. Only pole & insulator supplied by the dept.