592 results • Best match
29/SE(T)AMAUSI ZONE/2026-27
Dragging of ST/PCC Pole digging of pit erection of sub-station type double pole structure on ST/PCC Pole with fixing of necessary item such as Top Channel, along with grouting (As per RESPO Norms) Dropper Channel, 11 pin insulator with Pin & 11 KV Disc Insulator with fitting, DO Fuse set its ramming, as per RESPO Specification. Only Pole and insulator will be Provided by the Department.
Annual maintenance of electrical installation, all pump house LT panel, all pumps, boundry lights including supply of electrical materials of SUDA, ILGUS, Hostel Building and Canteen Building by Central Mechanical Division under UDMA Department .
Labour charges for annual maintenance and repairing of electrical wiring & electrical installation of all offices and all pump houses panel including replacing of damaged electrical materials (Supply separately) including operation of pumps for all pump houses and operation of valve for office buildings incl. submersible pumps to maintain the water supply throughout the daily by filling O.H resorvoir atleast 3 times a day. Electrician & helper also maintaining staircase light, campus light, minor maintenance of 11KV substation, maintenance of sinage, cleaning of fan of above buildings by engaging 01(one) no. electrician, 02(two) nos. helper and 01(one) no. Semiskilld Helper during that period. The work should be executed by maintaining job resister with attendance register as per direction of EIC.
Design, Supply, Erection, Testing and Commissioning of Electro Mechanical Work of 24 MW KLM II
33 KV SWITCHYARD
increasing capacity of 33/11 KV Sub-Stations Kathariya Jageer , Baheri Tehsil AND other associates works under EDC Bareilly
welding & laying of G.S. strip 50x6mm size with structures and all equipments in switchyard and control room, M.S. Bar including cutting, binding and proper fixing etc. complete. The welding and laying of G.S. Strips to L.A. with full length of structures and also the M.S. bridge near L.A. structures.
increasing capacity of 33/11 KV Sub-Stations Izzatnagar , Bhuta,Thiriya Nizawat Kha and other associates works under EDC Bareilly
welding & laying of G.S. strip 50x6mm size with structures and all equipments in switchyard and control room, M.S. Bar including cutting, binding and proper fixing etc. complete. The welding and laying of G.S. Strips to L.A. with full length of structures and also the M.S. bridge near L.A. structures.
increasing capacity of 33/11 KV Sub-Stations Kyoladiya, Nawabganj (Rural), Faridpur Rural and other associates works under EDC Bareilly
welding & laying of G.S. strip 50x6mm size with structures and all equipments in switchyard and control room, M.S. Bar including cutting, binding and proper fixing etc. complete. The welding and laying of G.S. Strips to L.A. with full length of structures and also the M.S. bridge near L.A. structures.