Increasing capacity of 33/11 KV Sub-Stations-Mirzapur, Jaitipur and other associates works under EDC Shahjahanpur
welding & laying of G.S. strip 50x6mm size with structures and all equipments in switchyard and control room, M.S. Bar including cutting, binding and proper fixing etc. complete. The welding and laying of G.S. Strips to L.A. with full length of structures and also the M.S. bridge near L.A. structures.
increasing capacity of 33/11 KV Sub-Stations Richha,Rithora and other associates works under EDC Bareilly
welding & laying of G.S. strip 50x6mm size with structures and all equipments in switchyard and control room, M.S. Bar including cutting, binding and proper fixing etc. complete. The welding and laying of G.S. Strips to L.A. with full length of structures and also the M.S. bridge near L.A. structures.
32/SE(T)AMAUSI ZONE/2026-27
Dragging of ST/PCC Pole digging of pit erection of sub-station type double pole structure on ST/PCC Pole with fixing of necessary item such as Top Channel, along with grouting (As per RESPO Norms) Dropper Channel, 11 pin insulator with Pin & 11 KV Disc Insulator with fitting, DO Fuse set its ramming, as per RESPO Specification. Only Pole and insulator will be Provided by the Department.
Tender for Prov. SOP to HP Shiva Cluster site at Koserian by providing 25 KVA, 11/0.4 KV S/Stn. along with HT and LT line in (E) section Talai under ESD HPSEBL, Talai.
Digging of pits for poles(size1800x1200x1500mm), stay set (size 900x 700x 1900mm), Earthing set (2 Mtr. Dia & 3 Mtr. Depth),drilling of holes in poles and x-arms, preparation of plateform str. Members, CI, AI x-arms and x-bracing set, erection of double poles with RCC muff, erection of plate form,X-Arms , dropout fuse unit, lightening arrestor, MCCB, Switch L.T. Box, energy meters etc,erection of transformers, porviding earthing connection to G.O. Switch & erection of G.O Switch, transformer lightining arrester etc., erection of stay set, erection of 25 KVA, 11/.4KV sub station, filling and ramming of pits, erection of jumpers, pipe earthing, LT cable, and fixing of barbed wire and painting of sub-station structure etc. complete in all respect.
Tender for SOP to HP Shiva Cluster by providing proposed 63 KVA. 11/0.4 KV S/Stn. Makrwana along with HT and LT line in (E) section Jhandutta under ESD HPSEBL, Jhandutta.
Digging of pits for poles(size1800x1200x1500mm), stay set (size 900x 700x 1900mm), Earthing set (2 Mtr. Dia & 3 Mtr. Depth),drilling of holes in poles and x-arms, preparation of plateform str. Members, CI, AI x-arms and x-bracing set, erection of double poles with RCC muff, erection of plate form,X-Arms , dropout fuse unit, lightening arrestor, MCCB, Switch L.T. Box, energy meters etc,erection of transformers, erection of GO switch, transformer lightining arrester etc., erection of stay set, erection of 63 KVA, 11/.4KV sub station, filling and ramming of pits, erection of jumpers, pipe earthing, LT cable, and fixing of barbed wire and painting of sub-station structure etc. complete in all respect.
CONSTRUCTION OF 02 NO 220 KV BADOHI BAY
Laying of following sizes of control cable in the cable trenches from C&R panel to various equiments, junction boxes in the switchyard as per cable schedule, its clamping. Binding at every two meter distance with aluminum sticks 25x1 mm size including carriage of cable drum from store to laying site and shifting back to store and all othe associated work to complete the job satisfactorily as per tech specification: