Loading…
Loading…
591 results • Best match
35/SE(T)AMAUSI ZONE/2026-27
Dragging of ST/PCC Pole digging of pit erection of sub-station type double pole structure on ST/PCC Pole with fixing of necessary item such as Top Channel, along with grouting (As per RESPO Norms) Dropper Channel, 11 pin insulator with Pin & 11 KV Disc Insulator with fitting, DO Fuse set its ramming, as per RESPO Specification. Only Pole and insulator will be Provided by the Department.
34/SE(T)AMAUSI ZONE/2026-27
Dragging of ST/PCC Pole digging of pit erection of sub-station type double pole structure on ST/PCC Pole with fixing of necessary item such as Top Channel, along with grouting (As per RESPO Norms) Dropper Channel, 11 pin insulator with Pin & 11 KV Disc Insulator with fitting, DO Fuse set its ramming, as per RESPO Specification. Only Pole and insulator will be Provided by the Department.
REPAIR/MAINT OF HT 33/11 KV OH LINE/ UG CABLE, HT VCBS, RMUS AND TRANSFORMERS INSTALLED AT DOMESTIC AREA, 3LU AND SITE 1A AND 1B AT AFS JODHPUR
Surface dressing/site clearance n exc 15 cm in depth in Sub stations area, trenches,sub station rooms, two pole/ four pole structure surroundings to make a over all presentable condition all as directed by Eng In charge.
Increasing capacity of 33/11 KV Sub-Stations-Kanth, Madnapur, Chauhnapur and other associates works under EDC Shahjahanpur
welding & laying of G.S. strip 50x6mm size with structures and all equipments in switchyard and control room, M.S. Bar including cutting, binding and proper fixing etc. complete. The welding and laying of G.S. Strips to L.A. with full length of structures and also the M.S. bridge near L.A. structures.
increasing capacity of 33/11 KV Sub-Stations-katra Rural, Badashahnagar and other associates works under EDC Shahjahanpur
welding & laying of G.S. strip 50x6mm size with structures and all equipments in switchyard and control room, M.S. Bar including cutting, binding and proper fixing etc. complete. The welding and laying of G.S. Strips to L.A. with full length of structures and also the M.S. bridge near L.A. structures.
increasing capacity of 33/11 KV Sub-Stations Faridpur Nagar Panchayat, Dhara Tanda and other associates works under EDC Bareilly
welding & laying of G.S. strip 50x6mm size with structures and all equipments in switchyard and control room, M.S. Bar including cutting, binding and proper fixing etc. complete. The welding and laying of G.S. Strips to L.A. with full length of structures and also the M.S. bridge near L.A. structures.