25/SE(T)/GNZ/2026-27
Approch road in switchyard bu using Interlocking Tiles Edge Bar in Switch Yard and Leveling of Yard by local soil, fine sand and stone greet size 30 to 40 mm.
24/SE(T)/GNZ/2026-27
Approch road in switchyard bu using Interlocking Tiles Edge Bar in Switch Yard and Leveling of Yard by local soil, fine sand and stone greet size 30 to 40 mm.
30/SE(T)AMAUSI ZONE/2026-27
Dragging of ST/PCC Pole digging of pit erection of sub-station type double pole structure on ST/PCC Pole with fixing of necessary item such as Top Channel, along with grouting (As per RESPO Norms) Dropper Channel, 11 pin insulator with Pin & 11 KV Disc Insulator with fitting, DO Fuse set its ramming, as per RESPO Specification. Only Pole and insulator will be Provided by the Department.
33/SE(T)AMAUSI ZONE/2026-27
Dragging of ST/PCC Pole digging of pit erection of sub-station type double pole structure on ST/PCC Pole with fixing of necessary item such as Top Channel, along with grouting (As per RESPO Norms) Dropper Channel, 11 pin insulator with Pin & 11 KV Disc Insulator with fitting, DO Fuse set its ramming, as per RESPO Specification. Only Pole and insulator will be Provided by the Department.
Design Engineering including Reverse Engineering Manufacturing Supply Erection Testing and Commissioning for Renovation Modernization and uprating of two Units of RABS Hydel Power Station
SWITCHYARD EQUIPMENT
Prov. SOP to BSNL 4G Tower, by aug of 25 KVA, 11/0.4 KV to 63 KVA S/Stn Guhal a/w 1- phase LT Line at Paddar (Majhog Sultani) in ES Jhaniari UESD No. 1 Hamirpur. T.S. No. 14/2026-27 (W.B.S. D-26-) ON PARTIAL TURN KEY BASIS.
Erection of 11/0.4KV, 63 KVA Sub-Station Structure as per latest standard practices /specification of REC / HPSEBL including digging of pits, Preparation of Plateform Structure Members MS Channel X Arms and Knee Bracing Sets, Erection of Plateform, fixing of M.S. Cross Arms S/Stn fitting, Painting of Complete structure with red oxide paint & then alluminium paint, fixing of GO Switch, DO fuse units, Lightening Arrestors, Disc Insulators, Pin Insulators, LT Ditribution Panel, Providing Earthing Connection to GO Switch, Transformer, Lighteneing Arrestor etc. Erection of Stay Sets, Erection of LT Cable and fixing of jumpers. Testing and commissioning of Transformer and allied equipments complete in all respect.