Loading…
Loading…
865 results • Best match
Equipment
1. Thermal block with 96 well based system, with the flexibility to use 96 Well plate or 0.2ml Tubes for Reaction set up 2. The block of the system should be made of Silver, and wells of the block should be coated with Gold to provide excellent Ramp Rate and Thermal uniformity during the run 3. System should provide High Ramp Rate with Heating Rate of 8°C/s and above and Cooling Rate 6°C/s and above minimum. 4. Temperature Uniformity :- ±0.15°C at 55°C, ±0.25°C at 72°C and ±0.50°C at 95°C 5. Thermal Performance of the System:- Range 3 – 99°C; control accuracy ±0.1°C 6. Number of Samples Per Run:- 1 x 96-well microplate with optical film; 12 x 8-well strips 0.2 ml with optical lids; 96 x 0.2 ml individual vessels with optical lids 7. System should be open to use Plasticware and Chemistries from different vendors 8. Sensitivity of Detection:- 1 nmol/l FAM at 30 µl sample volume in a 96-well PCR plate 9. Sample volume to be used on the System:- 5 – 100 µl per well 10. The system should be enabled shorter cycling times down to less than 30 minutes for 40 cycles for fast cycling chemistries. 11. System should provide Gradient feature with two different modes standard and linear with step options. 12. Detection time of the System:- Should be enabled with fast plate reading 96-well plate (single measurement, 5 colors) approximately 6 sec regardless of the number of filters. 13. Detection Technology:- Detection module should be PMT Tubes, with multiplex detection ability up to 5 Target without need of ROX dye as passive reference. 14. System should have 5 or more excitation and emission technology in a single well. 15. The system / software should allow users to select individual channels based on the experimental requirement. 16. Detection module should use 8 optical fibers fixed on shuttle system to scan fluorescence of samples from each row on the block during the run. 17. System should support following Real time PCR Applications:- Endpoint, Relative Quantification, Absolute Quantification, Melt curve Analysis and Target Detection. 18. The system should provide unlimited number of user licenses which should be available from website. Supportive documents are required. 19. The System should follow MIQE Guidelines, Analysis report should be available as per MIQE Guidelines. 20. The software of the system should provide access options for the end user to run the system as User, Supervisor and Administrator. 21. Should be supplied with suitable Plastic wares, Kits and Reagents for running the system. 22. Additional laptop should be provided for analyzing the data. 23. Maintenance:- System should not require calibration for Detection module, Minimal calibrations should be required as a part of Maintenance. 24. Warranty:- Standard three years from the date of installation 25. Training:- The vendor should provide training to 3-4 users at the time of installation.
Execution of S&T work for 1) Provision of CCTV, telephone and Railnet facility in connection with work 'Hatia Ranchi jn. Setting up of Mechanised Laundry of 6 TPD capacity in 2 shifts of 8 Hrs at HTE in Ranchi Division.', 2) Provision of FOIS connectivity & CCTV in connection with work ' Electronic In Motion Weighing Bridge(IEMWB), Cap-140 Ton for BICI'
1.10 34734.00 of Optical Fibre Cable along with HDPE pipe from the stores of SSE/Store or from any store of SE Railway to the site with care laying of HDPE pipe & blowing of OFC in it as per procedure and returning empty cable drums with or without left over cable to the stores of SSE/Store. It also includes supply and placing of warning & Detection tape orange colour of 100 mm wide printed in black as "CAUTION OFC CABLE" and laid throughout the trench as directed by the Representative of Railway. Note: OTDR of cables will be done before & after its laying by contractor under supervision of Railway representative & contractor will submit their reports. RANCHI DIVISION-S AND T/SOUTH EASTERN RLY
SITE SURVEY SITC OF CCTV SYSTEM AT KHANDONG PS
Optical Fiber Joint Closure As per ATC and Technical Specifications
Rate Contract for Supply Installation Commissioning of CCTV Surveillance Cameras
282 CI – INSTALLATION 26CI4 Fibre Termination: Install, test and commission of Optical fibre termination. The work shall include for all labour of fibre spicing and end terminations with proper tools as per the company standards. (1 core=2 fusion for fibre spicing). It also includes fixing of LIU, transreceiver, Fibre Patch Cord LC-SC Type, Fibre SM Pig Tails LC, LC Adapters, Fiber to copper converter in rack. • Fibre Termination: Install, test and commission of Optical fibre termination. The work shall include for all labour of fibre spicing and end terminations with proper tools as per the company standards. (1 core=2 fusion for fibre spicing). It also includes fixing of LIU, transreceiver, Fibre Patch Cord LC-SC Type, Fibre SM Pig Tails LC, LC Adapters, Fiber to copper converter in rack.
SOLAR POWERED CCTV SYSTEM AT KADAKKARAPPALY GRAMAPANCHAYATH MCF AND ITS MONITORING AT GRAMAPANCHAYATH OFFICE
Supplying and drawn of 6F Armored OS2 optical fiber cable, (with High carbon stay wire with all require accessories ) Single Mode, 9/125 - micron promary coated buffers, 9/125/250 (OS2) micron (OS 1 is not accepted), Corrugated Steel Tape Armour, BELLCORE GR 20/ IEC 794-1, Water Swellable Glass Yarm, Attenuation @1310nm & It; 0.34 db/KM MAX - @1550nm & It; 0.22 db/KM MAX, HDPE Outer Sheath, THIXOTROPIC Loose Tube Gel, Corrugated Steel Tape, Armouring Type, & gt; 0.15 Armouring Type Thickness, PBTP Loose Tube Material, BlackJacket Colour, 2.8mm Loose Tube Diameter, 2.0mm Jacket Nominal Thickness, 1250 N Tensile Strength
RMO Specialized Electrical and Mechanical Services at Tis Hazari Courts Building, Delhi. (SH Operation and Routine Maintenance of IP based CCTV Surveillance system installed at Tis Hazari Court Complex and Extension Block.)
Making provision of jointing and splicing of optical fiber cable (all core) inside LIU box including connection, testing & commissioning etc. complete as required.