Loading…
Loading…
863 results • Best match
Provision of GPON based Network for Rail net at major stations of Varanasi division.
"Laying of HDPE duct as per the approved cable route plan in the exavated trenches/other protected works/RCC 5 channel etc. including all accessories like end caps, collars, bends, couplers etc. The ends of the duct to be sealed with end plugs till OFC blowing is done. Important: The laying of OFC cable independently or along with Quad cable/PIJF cable in the same trench shall be governed by the RDSO drawings no. RDSO/TCDO/COP-6(a) and RDSO/TCDO/COP-8(a) respectively, issued vide Chapter- XIII of the Telecomm Manual."
Operations and Management of Kerala State Wide Area Network (KSWAN) including revamping of Infrastructure
Operations and Management of connectivity to remote offices through leased lines / OFC connectivity from DHQ/BHQ/MPOP. (20 Quarters)
Limited tender for Wi-Fi Campus project at FM University, Balasore
Pulling & laying of OFC cable
:Provision of Telecom installation in connection with " Augmentation of ELS/TATA for increasing holding from 150 to 200 Loco in CKP division of S.E.Railway.
Supply of Telecom Optical Fiber Tool Kit comprising of the minimum following equipment. i) Fiber Cleaver 18000 Cuts Type, ii) Tweezer, iii) Cable Sheath Jacket Stripper, iv) Buffer Tube/ Drop Cable Stripper, v) Utility Knife, vi) Screw Driver with Bits, vii) Alcohol dispenser, viii) 23 Cleaning Wipes (Set of minimum 100 Nos), ix) Visual Fault Locator 1mW, x) Plier Needle Nose, xi) Long Nose Plier, xii) Allen Key Set 4 to 10mm, xiii) Drop Cable Stripper, xiv) cable Cutter upto 25mm, xv) Fiber Protection sleeves, set of 100, xvi) Fiber Power meter with adopter, xvii) multi-purpose swa, xviii) Number sticker, xix) spanner set, xx) adjustable wrench, xxi) curved claw hammer, xxii) head light, xxiii) brush, xxiv) Polishing disk, xxv) 1 no. Carry Bag. ( inspection by representative of Dy.CSTE/CON/ROU)
Providing Additional CCTV cameras, including Ethernet switches and associated works for video surveillance system at Anushaktinagar, Mumbai-400094
Supply and laying of following 24 core, SM, OFC as per the specification and as indicated below Note: 1) The 24 core single mode fibre should be pulled by use of strength member provided inside the cable by using the proper pulling equipments. 2) The fiber outer sheath should not be damaged while pulling the fiber cable. 3) The polypropelene rope should be kept as spare inside the HDPE pipe, if in HDPE pipe, for the future laying of cables. 4) The force applied on the fiber optical cable should not exceed the pulling force recommended by the manufacturer. 5) While pulling the fiber optical cable, the minimum bending radius should not exceed the manufacturers' recommendation. 6) Pre-despatch inspection to be offered for the OFC. 7) Newly laid cable need proper aluminium tag required (indicating location) & route marker. Also if cable is laid on surface through duct proper aluminum tag should be fitted using ms tie on duct.
Proc of 30 km 600 mtr OFC
Laying of HDPE pipe including OFC laying and jointing enclosures as per requirement As per attached SOR