Loading…
Loading…
907 results • Best match
Supply, Erection, Testing & Commissioning of LILO to 400kV Mevasa from 66kV S/C Pragapar –Rapar line on D/C panther tower with AL-59 Conductor (Eq. Wt. to ACSR Panther Conductor) having Overhead line length 21.32Rkm under Anjar Circle. (Only OH Portion)
A.6.1 48 Fibre (DWSM) OPGW fibre Optic cable Km 21.350 195533.00 2385.00 1022.00 198940.00
Supply, Installation & commissioning of CCTV camera surveillance system at various Kansari Store under Deesa Construction, Palanpur Circle
separately configured with OFC (Optical Fiber Communications) and CAT-6 cable.
Supply, Installation, Testing, Commissioning, Operations and Maintenance (SITCOM) of Integrated Security and Traffic Management System (ISTMS) in Greater Noida City
Dedicated optical fiber networking for all field devices at all locations and datacentre with required bandwidth (including supply, digging, trenching, laying and maintenance for 5 years) as per above mentioned device quantities in all respects to make the solution complete including PoP locations for network distribution Note: Closed rooms for PoP will be provided by GNIDA however interiors, and IT equipment shall be provided by the bidder with required hardware, software, other passive components, power backup and HVAC), Measurement will be based on digging length. Pre laying of OFC, IA to ensure physical survey using GPR (Ground Penetration Radar) to ensure non-destructive detection of utilities to identify underlying features or buried services and detailed report to be submitted in both soft and hardcopy to the Authority)
Construction of 110kV LILO line to 110kV Mukunda Sub-station by utilizing 110kV DC towers from the tapping point of existing 110kV Munirabad-2 line for a distance of 12.62 kms along with construction of terminal bay at 110/11kV Mukkunda Sub-station in Sindhanur Taluk, Raichur District. (including civil works) of all materials/equipments.
Optical Fibre Cable Accommodations
Construction of building including clean room facility (class 100000 In working condition)
39.20.1 6 Core Multi Mode Optical Fiber Cable meter 200 87.00 17,400.00
Supply, Installation, testing and commissioning of Nine Nos SMAs and One No Seismometer to replace existing non functioning units at Bhakra Dam
(SMA Network -9 Stations ) OFC Cable:-Optical Fiber cable from 9 Stations to the control room including installation in Conduit Pipe (MR)