Loading…
Loading…
908 results • Best match
MOEI and Fan and other electrical services in PWD Offices under PWD Electrical Division South during 2026-27.
Supplying, installation, Testing and commissioning of following capacity 8 port Layer 2 indoor Network Switch having features and specifications etc. as mentioned here under: Minimum 8 X RJ-45 Gigabit Ethernet Ports and additional 2 X 1G SFP Ports with non-blocking architecture by having Switching capacity of minimum 20Gbps and packet forwarding rate of 14Mpps or higher, 8K MAC table. Internal dual AC Power supply with operating temperature of -5 degree Celsius to +50 degree Celsius. Jumbo frame: 10KB or higher, IGMP Snooping, IGMP snooping querier and support for IGMP Snooping Fast Leave, Should create 250 or more MLD groups, MLD Snooping, Per VLAN MLD Snooping C MLD Snooping Fast Leave, STP, RSTP, MSTP, Loopback detection, Multicast filtering, VLAN Tagging, ǪOS: 8 Ǫue per port, WRR, IPv4/IPv6 Interface : minimum 100 IPv4 static route entries and minimum 50 IPv6 static route entries, 700 Acess Control entries, SSH CSSL for IPv4 and IPv6, 802.1x, ARP Spoofing, DHCP Snooping and server screening, IP+MAC+Port Binding, Per Port Bandwidth Control, 802.1X Authentication (Supports local/RADIUS database, Port-based Access Control and EAP, OTP, TLS, TTLS, PEAP Support) Cable Diagnostic feature, LLDP, LLDPMED, SNTP/NTP, RMON, SNMP v1,v2c, v3 and SNMP Traps.Certifications: UL, CE, FCC, RoHS, MTCTE, OEM/Product must be on Trusted Telecom Portal of Department of Telecommunication, Government of India 8 port PoE Layer 2 Network Switch with PoE Support of 130W or higher with each copper port supporting 802.3at PoE+
RENOVATION OF GUEST HOUSE AT GAIL ALAYA MINOR RENOVATION and SPACE OPTIMIZATION OF GAIL BHAWAN AND EXTERNAL DEVELOPMENTAL WORKS AT GAIL ASHIYANA
Supply, Installation, testing and commissioning of 24 port Cat 6A 19" Modular Toolless Patch Panel (loaded) enable all possible combinations of the various types of cable. mounted on the same panel by using various toolless connector blocks/modules. Have a metal structure enabling them to be durably fixed to the uprights of the 19” chassis and assuring automatic grounding between toolless RJ-45 connectors, the panel, and the 19” uprights of the enclosure. Include rear cable support with plastic cable guides to hold cable without need for cable ties. Include quick mounting system to mount the panel into the 19” rails without use of cage-nuts. Front Removal IO's option for maintenance and trouble shooting with 6 Different Colours Labels for Labelling & Identification of Individual Ports. Tested and guaranteed under dual circuit IEEE PoE+ up to 50W for up to 2500 on-load connections / disconnections.
Conducting Final Location Survey, including collection of field details for geotechnical investigation, preparation of GADs & other drawings and preparation of survey report & estimate etc for the work of construction of double line Fly Over/ROR at Lajkura(10 km) in S.E.C. Railway.
Assessment of Quantity and preparation of estimate for signalling and telecommunication arrangement for all stations.
Augmentation of Block Working Arrangements by Provision of Solid State Block Instruments in lieu of Existing FM Block Instruments in POY-CNV and VNB-NIL Single Line Block Sections of Palakkad Division, along with Associated EI Alterations and Other Signalling Works at POY and CNV Stations.
Laying o f signaling/power/ telecommunication cables a s p e r cable plan in cable trenches, masonry ducts, RCC Pipes, DWC pipes, GI Pipes etc.(Supply of cables is not included in this schedule).
NETWORK IMPLEMENTATION
LAYING OF 24 CORE SINGLE MODE FIBER OPTIC CABLE
Provision of TIB at Talandu, Simlagarh, Debipur, Bagila, Boichigram, Garifa, Hooghlyghat stations in suburban sections over Howrah division.
Supply and Installation of 19" rack mouted 24 port Fiber management Distribution 38 system and termination of OFC and Splicing of all the Fibers inside the Terminal Box with provision of taking out OFC as required. This includes supply of all Installation accessories including the pigtails with connector as per order of practice for installation and commissioning of Optical Fiber System. INSPECTION : CONSIGNEE.