Loading…
Loading…
828 results • Best match
REPAIR/REPLACEMENT OF LT OVERHEAD LINES,LT CABLES,LT SWITCH GEARS AND LT PANELS, AND ASSOCIATED WORKS AT SECTOR C UNDER GE (N) PATIALA
Supply and fix LT spacer 02 way FIX type made out of PVC material and suitable to work on 1100 volts fixed between 02 conductors in any position along the LT line for any size of conductor along the feeder complete all as specified and directed.Make : Denson,Modern,Sintex
Work of Supply, Erection, Testing , commissioning of 3 Nos. 100KVA Distribution Transformer along with associated equipment at PWD Rest House, Paryecatta, Nuvem in V.P.Shristhal under Renovation and Improvement Scheme in SD-III, Canacona, Div.XVI
Supply of AAC ' ANT ' conductor of size 7/3.14mm. The stringing rate includes transportation, jointing, etc. 7.44 Kms of conductor shall be strung as phases for LT line. The conductor shall be comply to the technical specification.
REPAIR MAINT OF TRANSFORMER REPLACEMENT OF DAMAGED HT UG CABLE OH HT CONDUCTOR AND CONNECTING ACCESSORIES AT 1st HORSE AREA AND DII AREA UNDER AGE EM OF GE S MAMUN
Material and Labour for dehydration including filteration of transformer oil using dehydration filteration plant including testing of sample before and after dehydration and filteration complete all as specified and directed. (The dielectric strength to be achieved 60 KV at 2.5 mm gap after completion of dehydration and filteration). Note:- (i) Dehydration of transformer oil in the Transformer carried out on the site by dehydration machine. (ii) All the Labour work like disconnection of cable and reassemble & drum etc. has to be carried out by contractor under their own arrangement. (iii) Shut down of HT/LT line shall be taken by contractor from MES rep. (iv) Both test sheets of transformer oil before dehydration and after dehydration shall submitted to Engr-in-Charge.
ANNUAL RATE CONTRACT FOR MAINTENANCE OF LED STRIPS WITHIN SMC LIMITS AND SUPPLY SITC OF ELECTRICAL ITEMS AS AND WHEN REQUIRED IN ELECTRIC DIVISION SMC FOR THE FY 2026-27
Fabricated GI Channel as per design for use in HT Lines/Sub-stations
HT,LT pole shifting work for the construction of Nedupuzha ROB in favour of General Manager RBDCK
Fitting one No. Section fuse on LT line with dropping cables, crimping sockets, connecting with bolt & nut etc.
EXECUTION OF WORK FOR INCREASING CAPACITY OF TRANSFORMER AND SYSTEM AUGMENTATION/ STRENGTHENING (ON SEMI TURNKEY BASIS) IN THE AREA OF ELECTRICITY DISTRIBUTION DIVISION-KAURIRAM, GORAKHPUR AGAINST BUSINESS PLAN SCHEME 2026-27
Laying, stringing, sagging, binding and jumpering of LT AB Cable difference size as per Estimate for LT Line with fixing of Suspension Clamp with I Hook (Insulated), dead end Clamp with I Hook (Insulated), Piercing Connector (Insulated) along with installation LT Three phas Distribution box with clamp and nuts & bolts off siz as per required