Loading…
Loading…
3,982 results • Best match
De-stringing of existing Panther Conductor and Stringing and Supply of HTLS Conductor of Sonabil-Depota, Sonabil-Ghoramari and Ghoramari- Depota Transmission line
Supply of HTLS Conductor as per specification requirements Total Line length= 17.73 (10% extra for sag and Jumpers for both line & sub-station) = 17.73 +(17.73 X .1) = 19.503KM. Total Conductor required = 19.503 X 3 = 58.509KM Say 60KM
ARC FOR MAINTENANCE OF EXISTING RISING MAIN TRANSMISSION MAIN PIPE LINE WILL ALL OTHER REPAIRING WORK UNDER JEN SECTIN KUDI SUB DN DOLI
PHED O & M BSR 2020 1.4 Replacement of CI/ DI Double flange sluice valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including providing and fixing MS Nut and Bolt and rubber gasket, dewatering and providing adequate safety arrangement at site and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as Valve, Tail piece, CID Joints etc. shall be provided by Department free of cost)
CONSTRUCTION OF 132KV S/C TRANSMISSION LINE FROM 132/33KV SUB-STATION AT RENGPANG TO 132/25KV THINGOU N.F RAILWAY SUB-STATION ON TURNKEY BASIS.
A. 132KV TRANSMISSION LINE
Tender for deployment of maintenance gang (4 Skilled and 4 unskilled labourers) along with mtc. vehicle during winter season for emergency restoration of 66kV transmission lines under Construction Sub Division No-I, Totu and Sub-Station Construction
Deployment of maintenance gang (4 Skilled and 4 Unskilled labourers) during winter season along with making their boarding & lodging arrangements for emergency restoration of 66kV transmission lines under jurisdiction of Const Sub Division-I, Totu and Sub-Stn Const. Sub Division, Hulli in events of their breakdown for duration of 2 months.
Construction of various 220KV and 132KV transmission lines associated with 220KV GSS Karnu on turnkey basis
CONSTRUCTION OF 132/33 KV, 2X50 MVA GIS SUBSTATION AT HATHI BHATA (AJMER) ALONGWITH ASSOCIATED TRANSMISSION LINES INCLUDING SURVEY, SUPPLY OF ALL EQUIPMENT/MATERIALS, ERECTION (INCLUDING CIVIL WORKS), TESTING AND COMMISSIONING
Survey of existing Transmission Lines alongwith Bays and Buses at terminal substations