Loading…
Loading…
4,269 results • Best match
Carriage of medium power damaged/repaired distribution transformers of different capacity under the jurisdiction of Electricity Urban Distribution Division-(Technical) 11 KV and LT Line Network, Moradabad.
Shifting and Construction of 33KV line, 11KV line, LT line and Sub Stations due to road widening from Sunakhela to Ayatpur Road (0/0km to 11/540km).
Fixing of complete 11KV line Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts BA will do the excvation including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size ( 500mmx500mmx800mm) using 20mm BHG metal with all labour and material as per TPCODL Drawing & Standard.
Work of Repairing and Restarting the 33KV/11KV/LT Line and transformers damaged due to storm/vehicles and other reason in the working area of EDD-Phoolpur
Extension of HT/LT line ic. construction of 18 nos 1x63 KVA DT SS for bifurcation of DWS scheme (ESD-I, Teliamura 2nos scheme, ESD-II, Teliamura 7nos scheme, ESD-Kalyanpur 7nos scheme and ESD-Mungiakami 2nos scheme) from Private cons. under ED-TLM
Supply and Erection of 110 KV DC line on DC towers and stringing of 6 Nos Panther conductor 1no Earthwire for making LILO of the existing 110 KV Ingur to Kurukkathi II feeder at the Madavilagam 110 33 11 KV SS
Conversion of Individual FMB into Auto CAD File: Identification of respective lands that are corridored by the Transmission Line by Transect Walking System aiding with GPS devices along the center line of the corridor. Preparation of rough alignment sketch by denoting the Survey Numbers of the land that pass through. Based on the sketch, conversion of indivdual FMB Sketch with Ladder measurements that are corridored by the Transmission Line to be done within the Tolerance Limit in AutoCAD. Tolerance Limit shall be applied as per the Survey of India's Guidelines.
Work
Replacement of following damaged accessories in 33/11 KV /LT line -