Loading…
Loading…
4,645 results • Best match
Supply and Electrification of Bhajaneshwar Mandir in Someshwar Section of EDSD I Almora
Laying of Rabbit Conductor in HT Line
Amc of led street lights installed at various words of municipal corporation zone 3 4 with line maintenance and CCMS pannels complete in all respect for two year
... above) with complete materials, Suchas PCB , SPD Drivers, Glass, Chip, Wire etc Including line maintenance (as per scope of work). Complete in all respect. Which also include following ...
Amc of led street lights installed at various words of municipal corporation zone 1 2 5 with line maintenance and CCMS pannels complete in all respect for two year work
... above) with complete materials, Suchas PCB , SPD Drivers, Glass, Chip, Wire etc Including line maintenance (as per scope of work). Complete in all respect. Which also include following ...
LT OH Reconductoring work using ABC Boat palam Transformer area under Electrical Section Azhikode
Fitting one No. Section fuse on LT line with dropping cables, crimping sockets, connecting with bolt & nut etc.
Construction of 11kV feeder from 66kV Substation Karukutty to Puliyanam under Electrical Section, Karukutty
Fitting one LT 4 line cross arm on HT or LT existing poles incl. fitting insulators and binding the same with LT Line.
28/EDC(H)/2026-27
Stringing & Sagging ABC Cable (3x50+1x70+1x16) sq mm. winding & jumpering of LT Line With AB Conductor as per RESSPO norms AB Conductor Provided by Dpt and balance materials lin ke holding clamp eye hook suspension clamp &dead end clamp arranged by the conductor