Carrying out the work of Constructing 11KV New Feeders/Link Lines for reducing the load on Overloaded/Y-Operated Feeders on Partial Turnkey basis in Madduru Division.
A): HT Line Materials
Carrying out the work of Constructing 11KV New Feeders/Link Lines for reducing the load on Overloaded/Y-Operated Feeders on Partial Turnkey basis in Holenarasipura Division.
A): HT Line Materials
Combined package of Work-A - Establishing 2x31.5MVA 66/11kV GIS substation at Dr. Shivaramkaranth Layout, Rachenahalli in Bengaluru North Taluk, Bengaluru Urban District alongwith running (2.904 & 1.985)km of 66kV, 1000sqmm SC cables from Existing 220/66/11kV Manyatha GIS substation & 66/11kV Arkavathy Layout substation (work under execution by M/s.BDA) & Construction of 1no. 66kV Terminal bay at 66/11kV Arkavathy BDA Layout substation Work-B - Establishing 2x31.5MVA, 66/11kV substation at Karnataka Telecom Layout, Byalahalli village, Sarjapura Hobli, Anekal Taluk, Bengalore Urban District alongiwth running 5.985Rkm of 66kV, 1000sqmm D/C UG cable from proposed 66kV MC CTT near Sarjapura to Attibele LILO point to proposed 66/11kV Karnataka Telecom Layout, Byalahalli substation in Bangalore Urban District on Partial Turnkey Basis including Supply (excluding Supply of 11kV Switchgear), Mandatory spares, Erection, Civil Works of all materials/equipments, Testing & Commissioning
SSB17 For 66 kV Transmission line - For UG Cable line 1. All the C&R Panels and associated panels shall be of one and the same make for uniformity... with ABT features has to be provided both on HV side and LV side of C&R Panel. 3.The line differential relay shall be compatible with the existing line differential relays at Attibele & Sarjapura substations. No. 2.00
REPAIR AND COMPREHENSIVE MAINT TO LT ELECTRIC SUPPLY PANELS CAPACITOR BANK AND ALLIED ITEMS OF WORK AT DHOLEWAL UNDER GE LUDHIANA
S&F in replacement PVC two wire separator for LT lines including taking out old unserviceable seperator complete all as specified and directed.
Work of 100/250/400 KVA S/S Transformer on STP Pole and Other Related Works for Construction of 2 lane ROB in lieu of level Crossing 61/B on Prayagraj-Ayodhya Railway section Km 123/8-9 Near Mau Aima Railway Station in Distt. Prayagraj
Dismantling of 11 kv line/cable/support
Construction of 03 Nos. of new 11KV lines using 11KV UG cable from 110/11 KV Sadashivnagar and Fort substations for a distance of 9.27 RKms in Belagavi CSD-1 Subdivision of Belagavi Urban Division, HESCOM, on Total Turnkey Basis.
HT line in Rkms LT line in Rkms DTC in Nos