4,662 results • Best match
Replacement and welding of rusted/short height pole under 33/11 KV S/s Matkota under EDD-I, Rudrapur
Dismantling of existing LT/HT line. including disc fitting, Insulator, clamps, Nut & Bolts and consumer connections and Street light connections etc. including rolling of conductor and cartage back from site to JE store (PCC Single Pole).
Diversion of 03 nos of feeders from mandip chowk to new pump station via CMD View point of SOCP, IB Valley Area
Supplying and erection of cradle guard complete (Material – Galvanised Iron 6 SWG, Grid of 7X25 Mtr, Road Crossing Span 50 Mtr) in HT Line Crossing in Mines
Construction of New 11 KV feeder from 33/11 KV Sub-Station, Selaqui-1 for reducing load on Pharmacity S/S under EDSD, Selaqui under EDD, Mohanpur.
Laying of Rabbit Conductor in HT Line
Replacement of ACSR bare conductor by Insulated Covered Conductor (AAAC) in residential area related 33/11 KV S/s Bhadaipura under EDD-I, Rudrapur
Dismantling of existing HT line including disc fitting, Insulator, clamps, Nut & Bolts and consumer connections and Street light connections etc. including rolling of conductor and cartage back from site to JE store(ACSR weasel)
Shifting of 3P Structure of 11 mtr. long PCC Pole infront of H.No. 18SP and 2 Nos. 9 mtr. long PCC pole infront of H.No. 178 in Sector 1 and 4 at Hisar.
Job Work Supply and Erection of Stay set for HT line complete with GSS 7/8 SWG, Egg, insulator/ Disc Insulator, GI rod 20mm dia threaded up to 250mm length with Nut (wt.6.224kg), cross plate 460 mm of Channel 75×40×6mm (wt.5.330kg), Elbow (wt.2.240kg), clamp with Nut-Bolts etc. as per DHBVN specification complete in all respect up to the entire satisfaction of Engineer-in-charge. (Excluding GST)
For the work of Feeder Bifurcation, Replacement of Damaged HT Pole,Guarding of 11kV Line and Laying of Spare Cable sanctioned under Business Plan 2026-27 in areas under Electricity Urban Distribution Division- Townhall, Gorakhpur
Fixing of guarding for HT line at required locations complete with all materials, labour, tools & tackles as per RESPO norms, relevant IS specifications and direction of Engineer-in-Charge.