Loading…
Loading…
4,709 results • Best match
Shifting of 6.9 KM Steel pipeline network under South Goa GA
Big Size suitable for Polarisation Cells - Supply of Big Size (HT Line/ Bonding)Test Station weatherproof as per IOAGPL approved data sheet and drawings
Replacement of Bare Conductor to AAAC Conductor on 33 KV Main Line P-1 of 33/11 KV S/s Manpur, Kashipur under EDD Kashipur.
RESAGGING OF LOOSE ESISTING HT LINE
27/2025-26/EDCR Releasing new connection/ shifting of lines/increasing capacity etc. under deposit scheme in future under jurisdiction of EDD-Swar, Rampur
Laying of 11 KV/LT line 3x70/120/185 sq.mm. cable and etc. in the trench.
51/SE(T)AMAUSI ZONE/2025-26
Installation, commissioning of 250 KVA Transformer including its connection in between 11 kV line and LT line mounting of copper L-Pieces 300X65X6 mm, Providing Aluminium Crimping lugs of size 400 Sq. mm. (All the material except transformer and cables will be arranged by the contractor)
RE ROUTING 11KV LINE WITH ABC, PEELIPAPPAN-MATTATHINANI
Fitting one No. Section fuse on LT line with dropping cables, crimping sockets, connecting with bolt&nut etc.
LT Reconductoring at Punnol vayal, komal vayal and kuttivayal under ES kodiyeri
Fitting one No. Section fuse on LT line with dropping cables, crimping sockets, connecting with bolt & nut etc.