Loading…
Loading…
4,703 results • Best match
WORK OF REPAIRING OF VARIOUS SIZE LEAKAGE and REMOVING ILLEGAL CONNECTION IN JEN SECTION Sikrai UNDER SUB DN SIKRAI Nit 22/2025-26
... valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site ...
WORK OF REPAIRING OF VARIOUS SIZE LEAKAGE and REMOVING ILLEGAL CONNECTION IN JEN SECTION GEEJGARH UNDER SUB DN SIKRAI Nit 21/2025-26
... valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site ...
REPAIR / MAINT OF EXT ELECT INC LT OHT LINES, LT PANELS, APFC PANELS, MCCBS, EARTHING, UG CABLES, LT POLES, STREET/PERIMETER LIGHTS AND CONNECTED WORKS AT JAK LI RC UNDER GE 970 EWS.
Disconnecting the windings of loose overhead conductors of LT lines from insulators and restringing the same for proper sag and rewinding incl aluminium winding wires, tapes etc and jumpering for any type of conductor complete of single run conductor all as directed. Note: Triming of tree branches upto 3 mtrs from the conductor is deemed to be included in the rates quoted.
Chamordubi ELIS under SOPD-G under Lakhimpur LAC for the year 2025-26 under Lakhimpur-Ranganodi-Bihpuria Division (Irrigation), North Lakhimpur (Package no. 02)
Drawal of 11KV HT Line 800 m (Approx.) & Erection of 63 KVA Transformer Sub station ALIGNMENT OF HT LINE: Surveying and finalising the suitable tapping point in existing near by 11kV line in consultation with APDC LandDepartmental Officers, marking the alignment of the line considering Right of Way, Feasibility etc. as required and as directed Analysis for 0 to 500 M Length
Deviation of existing 230 kv SP koil Oragadam SPR oragadam DC line on DC tower Kriya Mediacl Tech SIPCOT
Arranging and availing of Shutdown works on LT & HT lines, etc., complete.
COMPREHENSIVE MAINTENANCE OF EM INSTALLATIONS WITH ALLIED WORKS AT ALFA PH UNDER GE UTILITY AMBALA
Material and labour of Bamboo ladder 24' height (24 steps ) for LT line and 27 ' height (27 steps ) for HT line complete all as specified and directed.