Loading…
Loading…
4,703 results • Best match
REPAIR AND REPLACEMENT AND IMPROVEMENT OF HT OH LINES, UG EXTERNAL ELECTRIC SUPPLY SYSTEM, GOD SWITCH, SF6/VCV/ RMUs OF 11 KVA/ 66 KVA AND CONNECTED ALLIED WORKS UNDER GE WEST PATHANKOT
... and Labour only for Pruning of trees and branches along the HT/LT over head electric lines, surrounding of LT/HT poles, panels Sub-STN bldgs & transformers at different location ...
REPAIR TO ELECTRICAL SUPPLY HT NETWORK AT CHOUHTAN UNDER GE AF UTARLAI
M&L for Pruning of trees and branches along the LT over head electric lines, surrounding of LT poles, should be cleared upto 3 mtr of outer edge of LT line and poles and thorwn out branches out side the cantonment area complete all as specified and directed
AS PER NIT
Dismentalling of old conductor and ST Pole from HT/LT Line including cartage, loading unloading & proper stacking from work site to store center sultanpur. as per RESPO norms.
Installation and Energisation of Badatribida-III LI Project in Kaniha Block
Construction of 3 Phase 4 wire LT Line supports 200 KG PSC Pole having span length 30 mtr with 34 mm2 AB cable.
Repair of Road lighting on 4 Lane of Faridkot-Sadiq-Guruharsahai Road Distt. Ferozepur 5.35 KM.
SHEET METAL CUBICAL PEDESTAL, TOWER STRUCTURES, HT & LT LINE ITEMS, MS CHANNELS, BRASS GLANDS, ALUMINIUM & COPPER THIMBLES:
SPL REP/REPLACEMENT AND REROUTING OF OH ACSR CONDUCTOR INTO UG HT CABLE AND CONN WKS AT MS VIHAR SUBSTATION TO JAK LI AND SPL REP/REPLACEMENT AND REROUTING OF OH ACSR CONDUCTOR INTO UG HT CALBE AND CONN WKS FROM NEAR 118 ENGR UNDER GE (S) AKHNOOR
... installation on two pole structure or PCC platform etc including connceting incoming HT and LT line complete all as specified and as directed by Engr- in- Charge.