Loading…
Loading…
4,706 results • Best match
For the work of Replacement of Damaged Line and Pole, Construction of Double Pole, Battery and Charger, Installation of 11kV Fuse Set, Laying of Spare Cable and Installation of Rubber Mat sanctioned under Business Plan 2026-27 in areas EUDD IV
Laying & sagging of LT ABC (3X120+1X95+1X16) Sq.mm. Cable of LT Line with fixing of Distribution Box with Clamp, Insulated Dead end clamp with I hook, Suspension ...
Restructuring works for construction of Vallapuzha ROB In F/O Deputy General Manager, RBDCK Kochi under Electrical Section Vallappuzha (RW-6703-202526-148)
221 - Fitting one No. Section fuse on LT line with dropping cables, crimping sockets, connecting with bolt & nut etc.
Including 6 years defect liability period for T/F, 5 year defect liability period for solar high mast and 3 years defect liability period for other items, free of cost
NS) Supply and erection of LT/HT guards made from GI wire 8 SWG and suitable for guard real and insulator and provided between neutral and earth wire complete in all respect as per DHBVNL specification and between two earth conductor for LT lines..
REPAIR / MAINT OF BLDG SECURITY LIGHT FITTINGS, LIGHTENING CONDUCTORS, EARTHING AND MISC CONNECTED WORKS OF JAK LI RC UNDER GE 970 EWS
Disconnectig the bindings of loose overhead conductors of LT lines from insulators and restringing the same for proper sag and rewinding incl aluminium winding wires,tapes etc and jumpering for any type of conductor complete all as directed.
LIConstruction of Na-Dihing LIS at Dirak Sumoni Gaon under Sadiya LAC under SOPD-G for the year 2025-26 under Sadiya-Doomdooma Division, (Irrigation), Sadiya Package no. 05
ALIGNMENT OF HT LINE : Surveying and finalising the suitable tapping point in existing nearby 11 kV line in consultation with APDCL and Departmental Officers, marking the alignment of the line considering Right of Way, Feasibility etc. as required and as directed (a) For first 500 m
LAYING, HDD AND ASSOCIATED WORKS OF STEEL PIPELINE UNDER JAMSHEDPUR GA (MANGO AND AGRICO AREA) FOR CITY GAS DISTRIBUTION NETWORK (1 YEAR ARC)
Crossing the all-foreign pipeline / HT line / cable / any other utilities etc. with necessary concrete / PVC protection including coordination with all agencies and obtaining NOC.