Loading…
Loading…
4,706 results • Best match
Supplying, Installation, testing, commissioning and energization of 400 KVA 33-11/0.433 KV transformer and balance L.T. lines with all other allied items in Sector-75 Faridabad. (Including defect liability 6 Year for transformer and 3 year defect lia
Supply and erection of L.T. stay set for LT Line complete in all respect with G.I. stay wire( rope of 7 wires of 8 SWG G.I. Wire), egg/Disc ...
03/2026-27
Installation of Mounting of Following capacity of Transformer including its connection between 11 KV and LT Line mounting provinding Crimping type Aluminium lugs of required size.( All the material except transformer will be arranged by the contractor)
Annual Rate Contract For LI Line installation and Shifting in Municipal Council Area
... MS channel, Lattic tower 12.6mtr. , 11 mtr. along with the ACSR Conductors, 11KV/33KV/LT line etc. 11KV insulator LT insulator guard wires, staywires and other electric items of the ...
Shifting of 33KV Line from Master Plan 100ft. wide Road R.K. Circle to Shobhagpura Circle. 7410
... MS channel, Lattic tower 12.6mtr. , 11 mtr. along with the ACSR Conductors, 11KV/33KV/LT line etc. 11KV insulator LT insulator guard wires, staywires and other electric items of the ...
Erection of 110 KV SC line on DC tower (17KM) with Panther conductor from existing Thuvakudy 230kV SS to K.Sathanur 110 kV SS with supply of all materials.(Loc 1 to 82, 86 to 87) .
Lowering the HT/LT Line during stringing of power conductor and earthwire after restringing the same in original position including labour,lead ,lift etc complete.
Erection of 110 KV DC Line on DC tower (0.40kM)by making LILO in the existing 110 KV Thiruverumbur K.Sathanur Feeder to the Mannarpuram 110kV SS with supply of all materials(Loc.15 to UG cable termination point).
Lowering the HT/LT Line during stringing of power conductor and earthwire after restringing the same in original position including labour,lead ,lift etc complete