Loading…
Loading…
4,706 results • Best match
COMPREHENSIVE MAINTENANCE OF MES 110 KV SUBSTATION INCLUDING 110/11 KV POWER TRANSFORMERS, SUBSTATION YARD, 11 KV VCB PANELS, SCADA SYSTEM, AUX TRANSFORMER, APFC PANELS AT NAVAL BASE KOCHI
... Electrical and minimum 5 years experience in operation of 110 KV Substation and 11 KV HT lines and having valid electrical license to operate 11 KV HT equipments including SCADA monitoring ...
NIT 06 Work of Repairing of Leakage in Different Size Pipe Line and Removing of Illegal Connection at RWSS Scheme in Section Mahwa
... valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site ...
NIT 03 Work of Repairing of Leakage in Different Size pipe Line and Removing of Illegal Connection at UWSS Mahwa in Section Mahwa
... valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site ...
NIT 14 Work of Repairing of Pipe Line and Removing of Illegal Connection in Sub Div. Manoharpur
... valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site ...
NIT 18 Work of Repairing of Leakage in Different size Pipe Line and Removing of Illegal Connection in Section Mandawar
... valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site ...
REPAIRS/MAINT OF MS/GI/CI PIPE LINES, SLUICE VALVES / MAINT OF DISTBN OF PIPE LINES OF 9 MT, APS AMMUNITION AREA, TARAMATHI LINES / REPAIR/REPL OF LT PANEL BOARDS CAPACITOR BANKS, LT UG CABLES OF CQA AREA, 9 MT, 7 RR DG, O/S MKD UNDER GE GOLCONDA
Tightening and straightening of LT overhead line of ACSR conductors (04 No LT Line conductors & 02 Street Light conductors) any size and span of upto 40 Meter by disconnecting and removing from insulators and tightening the conductor using rope, chain pulley block etc and binding the conductor on insulators with and including binding wire and jumpers of ACSR complete all as specified and directed.