Loading…
Loading…
1,100 results • Best match
Laying of 150 NB DI pipe for ETP sludge disposal under CAPEX 2025-2026 by AHP-MM, KTPS
Shifting & Transportation of removed ash /soil By Truck with Loading & Unloading by Head up to 3000 mtr
SELECTION OF AGENCIES FOR DESIGNING, EXECUTING AND MANAGEMENT OF GOA TOURISM PAVILLION IN DOMESTIC TOURISM EXHIBITIONS (RETENDER)
The Work Plan along with the timelines to execute the construction of the stall and logistics involved.(*Please Refer Tender For More Details)
Running Contract for attending Repair works of all 33 -11KV Power Transformers available in Pudukkottai EDC for a period of one year
Labour charges for loading/ Unloading of Power /auto transformer with complete accessories including released oil, initial lead of 5 Metres as directed by the Field Engineer .
Maintenance and repair work for pipelines under the Water Supply Department of Daund Municipal Council
Providing and supplying in standard lengths Polyethelene Pipes, confirming to IS 4984 / 14151 / 12786 / 13488 with nesessary jointing material like mechanical connector i. e. thread / insert joint / quick release coupler joint / compression fitting joint or flanged joint excluding coupler/specials, including transportation and freight charges, inspection charges, loading / unloading charges,
CONSULTANCY SERVICES FOR 220 KV SWITCHYARD EXTENSION, 220 KV OVERHEAD TRANSMISSION LINE, 220 kV CABLING AND ASSOCIATED SYSTEM FOR PERMANENT GRID POWER REQUIREMENT 2000 TPD COAL TO AMMONIUM NITRATE PROJECT AT LAKHANPUR, JHARSUGUDA (ODISHA)
(A) • Carrying out tower spotting and preparation of Tower schedule of Transmission Line Route. • Soil Investigation • Design of 220 kV Transmission Line, 220 kV Cabling System, Extension of 220 kV AIS Switchyard / GIS and associated System • Statutory Approvals and Clearances • Right of Way (ROW) Facilitation • Tendering services including preparation of technical specifications and scope of work, preparation of complete bid documents(includingcommercial part) and BOQ, Detailed cost estimates with basis, clarification of bidder’s queries, technocommercial evaluation of bids and preparation of Techno-commercial Recommendation, price bid evaluation and recommendation to BCGCL for award of contract, Preparation of Work Order / Contract for issuance to successful Contractor. • Engineering review including review of route alignment, Tower schedule, foundation design, sag-tension calculations, drawings and engineering documents of 220 kV Transmission Line, 220 kV Cabling System, Extension of 220 kV AIS Switchyard / GIS and associated System but not limited to, submitted by the contractor to ensure compliance with project specifications and standards. • Inspection and quality monitoring including witnessing factory acceptance tests (FAT), review of inspection reports, monitoring contractor quality assurance procedures and verification of materials and equipment compliance with specifications • Project Monitoring and Reporting • Contract Management • Project Documentation • Warehousing (B) Construction supervision and monitoring of 220 kV Transmission Line, 220 kV Cabling System, Extension of 220 kV AIS Switchyard / GIS and associated System including foundation works, tower erection, conductor stringing, earthing & lightning protection; Equipment installation, Busbar erection, Cable laying, Control and protection panel installation, testing & commissioning of transmission line and Switchyard / Substation Equipment & Systems and all other works and associated works to ensure compliance with approved drawings, specifications and project schedule . NOTE-Please refer SOR placed at part II of NIT (Document No. PC-298-SOR-0804)for quoting the Lumpsum price
Request for Proposals (RFP) for Selection of Service Provider for the Development of a Maritime Training Ecosystem