Loading…
Loading…
14,775 results • Best match
Facility Management Services - LumpSum Based - SUPPLY OF WATER TANKER IMPLAYER PIPE; SUPPLY OF WATER TANKER IMPLAYER PIPE; Consumables to be provided by service provider (inclusive in contract cost)
Facility Management Services - LumpSum Based - SUPPLY OF WATER TANKER IMPLAYER PIPE; SUPPLY OF WATER TANKER IMPLAYER PIPE; Consumables to be provided by service provider (inclusive in contract cost)
Custom Bid for Services - SERVICES FOR SUPPLY OF WATER FOR DOMESTIC AND FIRE WATER REPLENISHMENT PURPOSES Similar Category Domestic Logistics by Water
Custom Bid for Services - SERVICES FOR SUPPLY OF WATER FOR DOMESTIC AND FIRE WATER REPLENISHMENT PURPOSES Similar Category Domestic Logistics by Water
ARMO to GPRA at Nirman Vihar-III Sector-3, Nirman Parisar, Sectror-7, & Holiday Home and Nirman Vihar-II Sector-2, Vidhyadhar Nagar Jaipur during 2026-27 SH: Operation and Maintenance of Sewage Treatment Plant Cap 100 KLD (2 Nos), 20 KLD & 35 KLD at ... civil work
Emergent supply (on hire charge basis), installation, operation, look after during monsoon period of 01 no. 26HP diesel operated surface dewatering pump including the supply of POL with the incidental charges for pumping the storm/drainage water
Cost of consumable including supply of POL for operation of Diesel driven pump of different capacity at different site. (26 HP pump)
PAINTING OF EXTERNAL SERVICES, MAINT OF DAMAGED BROKEN ROOF SHEET, FLOOR TILE, KOTA STONE AND REPAIR MAINT OF WATER SUPPLY PUMP AND MOTOR, WATER SUPPLY DISTRIBUTION PIPE LINE GI PIPE LINE AND PERIODIC CLEANING OF UG SUMP AND OVERHEAD WATER SUPPLY T
M&L for seven stage cleaning and sterilization of inside the RCC/Underground/semi underground/OHT/ Sedimentation / clear water sumps of following capacity through bacteriological treatment by using Calcium hyphoclhorite or equivalants cleaning agents. :- (a). First Stage is to drain out the water by using exit valve or our own high capacity dewatering system or by own arrangement. (b). Second stage is cleaning all the algae formation and removing the accumulated silt from bottom bed and side walls by brushing with Steel wire/nylon brush or scrubbing the walls of the tanks or removing other sticky or foreign materials from adhering surfaces and washing inside surfaces with suitable chemical. (c). Third stage is fresh water cleaning by high speed jet pump with a pressure of 5 psi. (d). Fourth stage and first bacteria screening and degermification by using Laboratory certified branded halogen compound. (e). Fifth stage is cleaning the floor of water tank by heavy duty industrial vacuum cleaner. (f) . Sixth stage is the second bacteria screening and sterilizing method by using ultra violet ray Ejector covering 360 degree within the tank and kills all suspended bacteria. (g) Seventh stage of cleaning and third bacteria screening is to sterilize the floor of the water tank by using laboratory certified, oxydizing agent. Note :- (i)Contractor shall be fully responsible for all security and saftey measures. (ii) Contractor shall ensure that during cleaning of tanks etc water supply system is not intrupted. (iii) Chemical used and T&P rate deemed to be included in qupted rate. (iv) Paintings of information board. (v) Test certificates of all chemicals used and a bacteriological test certificate of the cleaned tank shall be submitted by the contractor after completion of work.
Water supply and maintenance work in Textile Centre Scheme
PART ( A ) :-- WATER SUPPLY WORK