Loading…
Loading…
14,780 results • Best match
Maintenance of water supply system in IGCAR, Kalpakkam during the year 2026-2027.
Attending the following works (i) In the Main gate pump house and 4 nos. of Poyyakarai lake bore-well pump houses areas daily and as and when required which comprises of operation of water supply pumps & bore well pumps including monitoring water levels in UG sump and regulating water supply by operating isolation valves, including greasing pumps whenever required, cleaning of pumps, pump rooms and pathways etc. (ii) In Edaiyur wells pump houses of IGCAR daily throughout the year excluding holidays and sundays which comprises of Operation of water supply pumps including monitoring water levels in the wells and over head water tank of CWCP and regulating water supply depends up on the requirements and Cleaning the pumps, pump rooms and keeping the surroundings of pump rooms and wells are clean etc. (iii) In BHAVINI and FRFCF/GSO pump houses at IGCAR reservoir daily throughout the year excluding holidays and sundays which comprises of Operation of water supply pumps including monitoring water levels in the IGCAR Reservoir and BHAVINI Reservoir and regulating water supply depends up on the requirements and Cleaning the pumps, pump rooms and keeping the surroundings of pump rooms and wells are clean. etc., (iv) In R&D Lab pump houses, North plant pump house, DWR, KKM Gate pump house daily throughout the year excluding holidays and sundays which comprises of Operation of water supply pumps including monitoring water levels in the sump and over head tank and regulating water supply depends up on the requirements and Cleaning the pumps, pump rooms and keeping the surroundings of pump rooms and wells are clean.etc., complete all as directed by the Engineer-in-Charge. Note : Contractor has to engage totally 4 (four) operator (skilled manpower) in General shift timing 9:00 hours to 17:30 hours, for each location one job will be paid for one operator. If any shortfall found during the contract period, he will be penalised at the rate of 1 Job/operator/day shall be deducted from the RA bills.
Open tender for zonal works UDL-ASN section from Km no. 180.0 to Km no. 215.5 OYR(Excluding) to ASN (Excluding) all service & station buildings, Up Yard, etc & all other assets including minor Road, Wood, Pipe Laying & Sanitary Installation Work, ... SSE/ Works /I/Andal ...
Open tender for all zonal works BCQ to SLS section from Km.215.00 to 227.00 including Hirapur Yard & STN station & Colony. This includes all service building & colonies etc. and including , minor road, Wood works, pipe laying & sanitary installation ... installation works under ... SSE/ Works /Sitarampur ...
Supply (on hire charge basis), installation, operation,look after during monsoon period of 01 no., 20HP diesel operated surface dewatering pump including the supply of POL with the incidental charges for pumping the storm/drainage water at Sulta
Cost of consumable including supply of POL for operation of Diesel driven pump of different capacity at different site. (20 HP pump)
Supply (on hire charge basis), installation, operation , look after during monsoon period of 01 no., 26HP diesel operated surface dewatering pump including the supply of POL with the incidental charges for pumping the storm/drainage water at Jagat
Cost of consumable including supply of POL for operation of Diesel driven pump of different capacity at different site. (26 HP pump)
as per tender
WATER SUPPLY SCHEME