Loading…
Loading…
14,777 results • Best match
Supply of Water Tankers 5000 Ltr Capacity
2026-2027 - ANNUAL TENDER FOR SUPPLY OF WATER MATERIALS - MOTOR, PVC, GI PIPES AND FITTINGS MATERIALS
UN PLASTICIZED PVC PIPES FOR PORTABLE WATER SUPPLY AS PER IS 4985/2000 GST extra applicable as per GO - 4KSC
2026-2027 - ANNUAL TENDER FOR SUPPLY OF WATER MATERIALS - MOTOR, PVC, GI PIPES AND FITTINGS MATERIALS
UN PLASTICIZED PVC PIPES FOR PORTABLE WATER SUPPLY AS PER IS 4985/2000 GST extra applicable as per GO - 4KSC
REPAIR, MAINT OF ELECTRIC APPLIANCES, WATER FILTERATION TANK, SENDIMENTATION TANK, EXTERNAL WATER SUPPLY, EXTERNAL ELECTRIC SUPPLY NET WORK AT TREHGAM, PATHAHIRI, PANCHGAM UNDER THE AOR OF GE 874 EWS.
M&L for lagging to pipes used in water supply or plumbing all round with, 40 mm thick bounded mineral wool preformed 'SNAPON' pipe section of density 144 Kg/cum conforming is IS 9842. On pipe of internal dia 20 mm with chicken mesh wire netting 25 mm gauge,20mm mesh complete all as specified and directed.
PROVISION OF WATER SUPPLY FOR ENGR REGT AT KARU UNDER GE 860 EWS
Note for Item No 9 to 11 above:- (A) 1 No. trial bore shall be carried out at location pointed at CGWB report for karu Stn as directed by GE. If possibility of water is seen then the bore will resume. (B) The cost of necessary fuel, lubricant and chemical extra required for construction of work shall be deemed to be included in the unit rate quoted by the tenderer and nothing extra shall be paid for these items. (C) The Contractor shall execute the borewell work first. Only after successful development of Borewell, execution of rest of the work as per BOQ shall be undertaken complete all as directed. (D) (a) In case of sufficient yield and potable water quality, trial bore will be developed as per the BOQ. (b) In case of insufficient yield, trial bore will be abandoned. Note : Contractor will be paid for Item No 9 & 10 of BOQ & the contract will be FORECLOSED. (c) In case of Non Potable water Quality, Trial Bore will abandoned. Note : Contractor will be paid for item no 9 to 11 of BOQ & the contract will be foreclosed.
Providing labour for water supply department at municipal council mul (3rd time)
manpower supply for water supply scheme