Loading…
Loading…
14,780 results • Best match
Operation And Maintenance Of Water Supply Systems - As per Scope of Work
Operation And Maintenance Of Water Supply Systems - As per Scope of Work
Barharwa Urban Water Supply Scheme with 5 years of Operation and Maintenance
Supplying labours, tools, tackles, lubricant etc. for laying and jointing DI/C.I.S/S Tyton pipes (class LA) trenches supplying rubber gasket (Rubber gaskets confirming to I.S.S.-5382-1969) and taking gasket joints including providing night guard, barrier and red light to safe guard against accident, all complete (Pipe to be supplied departmentally free of cost and laying of pipes is to be done as per (I.S.S. 3114 -1985) as per design, specification and direction of E/I. 250 mm dia
DEPOSIT Thrikkakara Municipality CSME Supplying and laying 160mm PVC and 90 mm PVC pipes for providing water supply to Winworth Apartment at Marottichodu Pipeline Work
100.9.11:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 160 mm nominal outside diameter pipes.
IMPROVEMENT OF EXISTING INFRASTRUCTURE, PROVIDING SEWERAGE NETWORK -GURUNANAK PURA
Construction, erection, testing and commissioning of Main Pumping station of 3.00 MLD capacity and new sewage treatment plant of 1.00 MLD capacity based on Sequencing Batch Reactor Technology (SBR) (Attached growth process) followed by Chlorination complete in all respect with PLC based SCADA, data transfer through modem to HSPCB and CPCB website/ server and all other works contingent there to as per complete scope of work mentioned in Annexure- I including Operation and Maintenance of new MPS and STP during defect liability period of 6 years after successful completion of 3 Months trial run on the commissioning of new MPS/Sewage treatment plant based on Sequencing Batch Reactor Technology (SBR) at Gurunanakpura Colony, Karnal:- (a) Entire Civil works, mechanical, electric and instrumentation works as per DNIT (As per detail attached at annexure – I and inclusive of OandM). (The rate quoted by contractor shall be bifurcated into capital cost (as 75%) and OandM cost (as 25%) of quoted L.S cost)
Maintaining water supply by deployment of staff at various BPS in Sec 7 Rohini
Maintain Water Supply – To maintain water supply from various booster pumping station (LT installation) as per prevalent schedule in break duty hrs ( Morning & Evening) as per direction of engineer-in-charge by operating all electrical and mechanical equipment, by deploying of semi- skilled, 1 no. in day shift break duty at each site detail of sites is as under:- 1. A-1, Sector-07 Rohini BPS. 2. F-25 Sector-07 Rohini BPS.1, 3. Naharpur village No 1 OLB Sector-07 Rohini. 4. H-18 Sec 7 Rohini BPS
Ballance work in Piped Water Supply Scheme under Jal Jeevan Mission at Village DONI Block BHITARWAR Distt.Gwalior based on T.W.including installation of electric submersible water motor pump, laying And jointing of rising main, feeder main and d
Ballance work in Piped Water Supply Scheme under Jal Jeevan Mission at Village doni Block bhitarwar Distt.Gwalior based on T.W.including installation of electric submersible water motor pump, laying And jointing of rising main, feeder main and distribution pipe line system, oht household tap connections, construction of pump house, (As Per BOQ) and construction of RCC sumpwell (As Per BOQ) electric power connections at tubewell including cost of all material And labour with 90 Days After completion of construction/ Execution of work with Sucessful testing and comissioning period of entire scheme.. as per boq